Current Investments
Canada's investment in energy innovation is an important part of building our clean economy.
Learn more about our contributions to Research, Development and Demonstration projects in Canada.
Project Title | Lead Proponent | Location | Technology Area | Innovation | Funding Program* | Status | NRCan funding | Total project value | Announcement Date |
---|---|---|---|---|---|---|---|---|---|
LysteMize™ Livestock Waste Characterization Study | Lystek | ON | Bioenergy | R&D | Energy Innovation Program | Active | $585,421 | $895,496 | 2024-11-21 |
Paulatuk Wind Energy Project | Hamlet of Paulatuk | NWT | Renewables | Energy Planning | IODI | Active | $ 500,000 | $ 705,000 | 2024-10-06 |
Né Askîy ᐊᐢᑭᐩ / Earth Project | Askiy Energy Corp. | AB | Renewables | Energy Planning | IODI | Active | $ 500,000 | $ 506,726 | 2024-10-06 |
Small Steps, Big Strides | Tahltan Band Council | BC | Renewables | Energy Planning | IODI | Active | $ 500,000 | $ 583,000 | 2024-10-04 |
Gwa’yas’dums Village Energy Efficiency Planning | Kwikwasut'inuxw Haxwa'mis First Nation | BC | Renewables | Energy Planning | IODI | Active | $ 500,000 | $ 500,000 | 2024-10-06 |
Uchucklesaht Climate Action Plan | Uchucklesaht Tribe Government | BC | Renewables | Energy Planning | IODI | Active | $ 500,000 | $540, 000 | 2024-10-06 |
XGFNG Community Energy Plan | Xent Gwet’in First Nations Government | BC | Renewables | Energy Planning | IODI | Active | $ 500,000 | $ 500,000 | 2024-10-06 |
Ganawenim Oodenaawin (Protecting Community) for a Sustainable Future | Kiashke Zaaging Anishinaabek – Gull Bay First Nation | ON | Renewables | Energy Planning | IODI | Active | $ 500,000 | $ 500,000 | 2024-10-06 |
Pangnirtung Clean Energy Committee | Hamlet of Pangnirtung | NU | Renewables | Energy Planning | IODI | Active | $ 500,000 | $ 500,000 | 2024-10-06 |
Project Pheonix | Geocycle Canada Inc | NS | Industry | Demonstration | Energy Innovation Program | Active | $ 3,529,880 | $ 11,345,000 | 2024-09-24 |
C&S for the Zero-Emission Vehicle Sector | CSA Group | ON | Transportation | R&D | Energy Innovation Program | Active | $ 3,616,373 | $ 4,822,241 | 2024-09-09- |
Net Zero Emerging Concepts and Technologies Research Program | Net Zero Atlantic | NS | Cleantech | R&D | Energy Innovation Program | Active | $ 3,250,000 | $ 6,500,000 | 2024- |
Atlantic Canada Offshore Wind Integration and Transmission Study | Net Zero Atlantic | NS | Cleantech | R&D | Energy Innovation Program | Active | $ 6,000,000 | $ 6,161,600 | 2024- |
Green Hydrogen Generation with Low Pressure Solid State Storage, Distribution, and Transport | Hydrogen in Motion Inc. | AB | Cleantech | R&D | Energy Innovation Program | Active | $ 590,223 | $ 2,880,447 | 2024-08-15 |
Production of Pure Hydrogen from Natural Gas Thermal Cracking | University of British Columbia | BC | Oil & Gas | Demonstration | Energy Innovation Program | Active | $ 1,250,000 | $ 2,700,000 | 2024-08-15 |
Markham Virtual Hydrogen Hybrid Demonstration Project | Enbridge | ON | Smart Grid and Energy Storage | Demonstration | Energy Innovation Program | Active | $ 900,000 | $ 1,250,000 | 2024-08-15 |
Liquid Organic Hydrogen Carrier (LOHC) for Secure, Efficient, and User-Friendly Hydrogen Storage and Transportation Technology | Ayrton Energy | AB | Renewables | Demonstration | Energy Innovation Program | Active | $ 1,090,000 | $ 3,498,000 | 2024-08-15 |
Grid Modernization Centre | The Governing Council of the University of Toronto | ON | Smart Grid and Energy Storage | Energy Innovation Program | Active | $ 5,000,000 | $ 16,554,370 | 2024-07-26 | |
Aurora Hydrogen Demonstration Plant | Aurora Hydrogen Inc. | AB | Bioenergy | Demonstration | Energy Innovation Program | Active | $3,000,000 | $13,233,815 | 2024-04-24 |
Zero-Carbon Hydrogen Production Via Pyrolysis | Innova Hydrogen Inc. | AB | Clean Fuels | R&D | Energy Innovation Program | Active | $1,000,000 | $4,047,350 | 2024-04-24 |
Carbon-Negative Methanol and efuels Production from Captured CO2 and Green Hydrogen | Quantiam Technologies | AB | Cleantech | R&D | Energy Innovation Program | Active | $1,000,000 | $2,178,886 | 2024-04-24 |
Bremner: A Strathcona County Hydrogen Community | ATCO Gas and Pipelines LTD. | AB | Renewables | FEED | Energy Innovation Program | Active | $1,300,450 | $4,957,000 | 2024-04-24 |
Hydrogen Dual Fuel for Heavy Duty Long Haul Vehicles | Innovative Fuel Systems Ltd. | AB | Renewables | R&D | Energy Innovation Program | Active | $1,264,550 | $5,115,249 | 2024-04-24 |
Fort Saskatchewan Operations Centre - Hydrogen Centre of Excellence | ATCO Gas and Pipelines | AB | Renewables | Demonstration | Energy Innovation Program | Active | $508,935 | $4,427,563 | 2024-04-24 |
A New Wave in Hydrogen Production | New Wave Hydrogen Inc. | AB | Renewables | R&D | Energy Innovation Program | Active | $415,000 | $2,071,345 | 2024-04-24 |
Future Homes Accelerator | EnviroCentre | ON | Energy Efficient Buildings and Communities | R&D | Greener Neighbourhoods Pilot Program | Active | $ 999,286 | $ 1,474,886 | 2024-07-16 |
Atlantic Canadian Retrofit Roadmap | The ReCover Initiative | NS | Energy Efficient Buildings and Communities | R&D | Greener Neighbourhoods Pilot Program | Active | $ 1,000,000 | $ 1,089,157 | 2024-07-16 |
Earthrise Retrofit Accelerator | Earthrise Building Services | YK | Energy Efficient Buildings and Communities | R&D | Greener Neighbourhoods Pilot Program | Active | $ 1,000,000 | $ 1,000,000 | 2024-07-16 |
FNPA’s Market Development Initiative for Community-Scale Energy Efficiency Retrofits in Indigenous Communities | First Nations Power Authority of Saskatchewan Inc. | SK | Energy Efficient Buildings and Communities | R&D | Greener Neighbourhoods Pilot Program | Active | $ 1,000,000 | $ 1,113,831 | 2024-07-16 |
Enabling Energiesprong Market Transformation by Supporting Ontario's Social Housing Market | Sustainable Buildings Canada | ON | Energy Efficient Buildings and Communities | R&D | Greener Neighbourhoods Pilot Program | Active | $ 602,836 | $ 737,764 | 2024-07-16 |
National Retrofit Repository and Engagement to Advance Canadian Deep Energy Retrofits | Retrofit Canada Society | AB | Buildings | R&D | Energy Innovation Program | Active | $ 775,897 | $ 835,847 | 2024-07-16 |
Energy-efficient Graphene-based Membrane Cooling Systems | Evercloak Inc. | ON | Energy Efficient Buildings and Communities | R&D | Energy Innovation Program | Active | $ 1,100,000 | $ 1,782,500 | 2024-07-10 |
A National-Scale, Measurement-Based Upstream Oil and Gas Methane Census | Carleton University | ON | Methane and VOC Emissions | R&D | Energy Innovation Program | Active | $2,000,000 | $ 4,033,108 | 2024-05-13 |
Canadian Landfill Methane Quantification Survey | St. Francis Xavier University | NS | Methane and VOC Emissions | R&D | Energy Innovation Program | Active | $ 979,428 | $ 1,328,248 | 2024-05-13 |
Diesel, solar, and battery microgrid: Hydro-Quebec Remote Communities in Nunavik (Quaqtaq) | Hydro-Québec | Quaqtaq, QC | Smart Grid and Energy Storage | Demonstration | GI: Green Infrastructure | Complete | $ 1,375,301 | $ 3,594,149 | 2024-04-09 |
Outaouais Green Building Community | Conseil régional de l'environnement et du développement durable de l'Outaouais | QC | Energy Efficient Buildings and Communities | R&D | Greener Neighbourhoods Pilot Program | Active | $ 461,537 | $ 556,838 | 2024-05-07 |
Klokon Creek/Augers Lake Small Hydro Electric Project - FEED Study | Xeni Gwet’in First Nations Government | BC | Clean Energy for Rural and Remote Communities | FEED Study | Wah-ila-toos | Active | $1,999,523 | $1,999,523 | 2024-01-18 |
Kamdis Tidal Power Demonstration Project Phase I: Front End Engineering & Design (FEED) Study | Yourbrook Energy Systems Ltd. | BC | Clean Energy for Rural and Remote Communities | Demonstration FEED Study | Wah-ila-toos | Active | $1,291,157 | $1,516,157 | 2024-01-18 |
Nemiah Valley Renewable Microgrid | Xeni Gwet’in First Nations Government | BC | Clean Energy for Rural and Remote Communities | Demonstration | GI: Green Infrastructure | Active | $2,479,266 | $7,438,191 | 2024-01-18 |
Yuquot Wave Energy Demonstration Project – FEED Study | Mowachaht/Muchalaht First Nation | BC | Clean Energy for Rural and Remote Communities | Demonstration FEED Study | GI: Green Infrastructure | Active | $1,077,085 | $1,131,664 | 2024-01-18 |
Shaping the Future Electricity System | The Transition Accelerator | AB | Energy Modelling | R&D | EIP | Active | $250,000 | $1,275,668 | 2023-12-12 |
Canadian Online Database of Building Envelope Details and Thermal Bridging Calculations: Design Tools for Energy Efficient Homes and Buildings | BC Housing Management Commission | BC | Energy Efficient Buildings and Communities | R&D | Green Infrastructure | Active | $720,000 | $990,000 | 2023-11-16 |
Net-Zero Navigator Platform | University of Victoria | BC | Energy Efficient Buildings and Communities | R&D | Green Infrastructure | Active | $750,000 | $1,123,950 | 2023-11-16 |
Net-Zero Energy Ready, New Construction Demonstration Program | Integral Group | BC | Energy Efficient Buildings and Communities | Demonstration | Green Infrastructure | Active | $1,179,000 | $2,359,000 | 2023-11-16 |
Sitkum Lodge Seniors Apartment Deep Retrofit | Greater Victoria Housing Society | BC | Energy Efficient Buildings and Communities | FEED | Green Infrastructure | Active | $139,250 | $278,500 | 2023-11-16 |
Demonstrating a Scalable, Low-carbon Deep Retrofit for High-Rise | QuadReal Property Group | BC | Energy Efficient Buildings and Communities | FEED | Green Infrastructure | Active | $217,500 | $435,000 | 2023-11-16 |
Accelerate Alliance: Developing Canada’s Battery Innovation Roadmap | Accelerate: Canada's ZEV Supply Chain Alliance | ON | Energy Modelling | R&D | EIP | Active | $500,000 | $603,220 | 2023-09-27 |
Web Tool Based On Macroeconomic And Electricity Modeling | Navius Research Inc. | BC | Energy Modelling | Energy Planning | EIP | Active | $360,000 | $360,000 | 2023-06-13 |
Canada Energy Outlook Pathways Explorer | Trottier Energy Institue of Polytechnique Montreal | QC | Energy Modelling | Energy Planning | EIP | Active | $372,573 | $583,150 | 2023-06-13 |
Pembina Energy Policy Simulator Update | Pembina Institute for Appropriate Development | AB | Energy Modelling | Energy Planning | EIP | Active | $230,000 | $280,630 | 2023-06-13 |
Tap&Go Electric Vehicle Charging Infrastructure Demonstration | Tap&Go | BC | Electric Vehicle Infrastructure Demonstrations | Demonstration | GI | Active | $2 M | $6.3 M | 2023-02-24 |
Ontario Home & Roam Low Carbon EV Charging Ecosystem | Ontario Charging Network LP (comprised of Ontario Power Generation and Hydro One) | ON | Electric Vehicle Infrastructure Demonstrations | Demonstration | GI | Active | $922,934 | $1.9 M | 2023-02-03 |
Open-Standard Load Management of EV Chargers for High Density Parking Sites | SWTCH Energy Inc. | ON | Electric Vehicle Infrastructure Demonstrations | Demonstration | GI | Active | $290,000 | $621,380 | 2023-02-03 |
Gordon Bell High School Deep Energy Retrofit | Province of Manitoba | MB | Energy Efficient Buildings and Communities | Demonstration | GI | Active | $160,200 | $369,000 | 2022-12-15 |
Opus One DERMS® Application Integration and Techno-Economic Enhancements | Opus One Solutions Energy ULC | ON | Smart Grid and Energy Storage | Energy planning | EIP | Complete | $500,000 | $1.1 M | 2022-11-16 |
Deep Energy Retrofit of JET Building | Morguard Corporation | ON | Energy Efficient Buildings and Communities | Demonstration | GI | Active | $135,274 | $274,298 | 2022-11-15 |
Blossom Park Apartments | Indwell Community Homes | ON | Energy Efficient Buildings and Communities | Demonstration | GI | Completed | $365,000 | $7.3 M | 2022-07-25 |
Net Zero Energy Ready Retrofit Housing Demonstration | Fanshawe College of Applied Arts and Technology | ON | Energy Efficient Buildings and Communities | Demonstration | GI | Active | $1,367,545 | $2,621,940 | 2022-07-25 |
Enwave Geothermal Community Energy System | Enwave Energy Corporation | ON | Energy Efficient Buildings and Communities | FEED Study | GI | Active | $350,000 | $818,367 | 2022-07-25 |
Deep Energy Retrofit of a 1940’s-era MURB | Toronto Community Housing Corporation | ON | Energy Efficient Buildings and Communities | Demonstration | GI | Active | $1.8 M | $6.8 M | 2022-06-23 |
Community Clean Energy Planning, Training and Implementation Planning in NunatuKavut | NunatuKavut Community Council Inc. | NL | Renewable Energy | R&D | Impact | Active | $1.6 M | $1.64 M | 2022-06-01 |
Solar North Phase 2, Old Masset New Housing Energy Efficiency, Solar South, Haida Wind | Haida Enterprise Corporation | BC | Renewable Energy | R&D | Impact | Active | $1.6 M | $9 M | 2022-06-01 |
Community Clean Energy Planning, Training and Implementation Planning in Kugaaruk – New Phase | Hamlet of Kugaaruk | NU | Renewable Energy | R&D | Impact | Active | $1.6 M | $1.6 M | 2022-06-01 |
Gjoa Haven Clean Energy Implementation | Hamlet of Gjoa Haven | NU | Renewable Energy | R&D | Impact | Active | $1.6 M | $1.6 M | 2022-06-01 |
Kinoosao Energy Retrofit Project/Kinoosao Microgrid Project | Jobb Developments | SK | Renewable Energy | R&D | Impact | Active | $1.6 M | $1.7 M | 2022-06-01 |
Coral Harbour Solar and Energy Storage Project and Naujaat Solar and Energy Storage Project | Sakku Investments Corporation | NU | Renewable Energy | R&D | Impact | Active | $1.6 M | $1.6 M | 2022-06-01 |
Advancing the Implementation of Vision 2030 | Nuxalk Nation | BC | Renewable Energy | R&D | Impact | Active | $1.6 M | $1.6 M | 2022-06-01 |
Community of Kuujjuaq Diesel Reduction - Project Implementation Phase | Societe Kuujjuamiut Inc. | QC | Renewable Energy | R&D | Impact | Active | $1.6 M | $1.7 M | 2022-06-01 |
Renewable Diesel, Solar Project, Retrofitting Community Homes, Heiltsuk Food Sovereignty, Passive House Kit, Capacity Development Strategy | Heiltsuk Economic Development Corporation | BC | Renewable Energy | R&D | Impact | Active | $1.6 M | $1.6 M | 2022-06-01 |
Tetlit Zheh Community Energy Plan | Teetl'it Gwich'in Band Council | NT | Renewable Energy | R&D | Impact | Active | $1.6 M | $1.7 M | 2022-06-01 |
Clean Energy Plan Implementation - Nunatsiavut Government | Nunatsiavut Government | NL | Renewable Energy | R&D | Impact | Active | $1.6 M | $1.6 M | 2022-06-01 |
Solar PV Rooftop Installation & Hydro Feasibility Study | Délı̨nę Got'ı̨nę Government | NT | Renewable Energy | R&D | Impact | Active | $1.6 M | $1.6 M | 2022-06-01 |
High Performance Residential and Commercial Buildings in Baker Lake, NU | ArchTech Inc. | NU | Renewable Energy | R&D | Impact | Active | $1.6 M | $1.89 M | 2022-06-01 |
Beaufort Delta Renewable Resource Plan | Nihtat Energy Ltd. | NT | Renewable Energy | R&D | Impact | Active | $800,000 | $2.6 M | 2022-06-01 |
Deep Retrofit Challenge | City of Toronto | ON | Energy Efficient Buildings and Communities | Demonstration | GI | Active | $5 M | $21.8 M | 2022-04-27 |
Arctic Charging and Heating Stations for EV’s Tethered to Islanded Hybrid Diesel-Renewable SmartGrid | TUGLIQ Energy Co. | QC | Electric Vehicle Infrastructure Demonstrations | Demonstration | GI | Active | $2.6 M | $5.2 M | 2022-04-27 |
Impact Canada – Women in Cleantech Challenge | MaRS Discovery District | ON | Cleantech | Demonstration | IMPACT | Complete | $5.2 M | $5.9 M | 2021-11-30 |
Permanent Aquatic Storage Structure (PASS) Demonstration Pit Lake Research Project | Suncor Energy Inc. | AB | Mining – Technology and Innovation | Demonstration | CGP | Active | $3 M | $25.8 M | 2022-04-04 |
High Pressure HDR with Hydrogen Co-Feed (H2-HDR) | Cenovus Energy | AB | Energy – Technology and Innovation | Demonstration | CGP | Active | $2 M | $6.26 M | 2022-04-04 |
Heavy Oil Viscosity Reduction Project | MEG Energy Corp | AB | Energy – Technology and Innovation | R&D | CGP | Active | $1.5 M | $3.79 M | 2022-04-04 |
Permanent Sealing of GHG Emitting Wells | Seal Well Inc. | AB SK |
Energy – Technology and Innovation | Demonstration | CGP | Active | $1 M | $2.48 M | 2022-04-04 |
Renewable Crude Oil Production from Sustainable biomass sources | Canfor Pulp Ltd. | BC | Forestry – Technology and Innovation | FEED Study | CGP | Active | $4.58 M | $22.3 M | 2022-03-30 |
Advanced ion exchange membrane water desalting plants | Saltworks Technologies Inc. | AB BC |
Energy – Technology and Innovation | R&D | CGP | Active | $2 M | $3.3 M | 2022-03-30 |
Biocarbon Injection at ArcelorMittal Dofasco | ArcelorMittal Dofasco | ON | Forestry – Technology and Innovation | Demonstration | CGP | Active | $1.8 M | $7.5 M | 2022-03-30 |
Renewable Natural Gas Through Electrocatalytic CO2 Conversion | University of Toronto | ON | Energy – Technology and Innovation | R&D | CGP | Active | $1.6 M | $2 M | 2022-03-30 |
Breakthrough technologies to increase Canadian RNG production from forest residues | University of British Columbia | BC | Forestry – Technology and Innovation | R&D | CGP | Active | $1.16 M | $1.92 M | 2022-03-30 |
Luminescent Solar Concentrators for Building Integrated Photovoltaics | Applied Quantum Materials Inc. | AB | Energy – Technology and Innovation | R&D | CGP | Active | $700,000 | $1.6 M | 2022-03-30 |
Field pilot of GHGSat's satellite-aircraft hybrid system in the BC Montney | GHGSat Inc. | BC | Methane and VOC Emissions | Demonstration | EIP | Active | $453,993 | $3.4 M | 2022-03-30 |
Towards cost-effective net-zero energy ready residential renovations | Canadian Home Builders’ Association | Canada | Energy Efficient Buildings and Communities | Demonstration | GI | Active | $4.4 M | $24 M | 2022-02-23 |
NS Power – Collaborative rid Innovation for Atlantic Smart Energy Communities | Nova Scotia Power | NS | Smart Grid Energy and Storage | Demonstration and Deployment | GI | Active | $5.1 M | $18.3 M | 2019-06-12 |
Prefabricated Net-Zero Energy Retrofit of Affordable Row Housing | Ottawa Community Housing | ON | Energy Efficient Buildings and Communities | Demonstration | GI | Active | $547,500 | $1.1 M | 2021-08-09 |
Vehicle to Grid Demand Response (V2G-DR) | Blackstone Energy Services Inc. | ON | Electric Vehicle Infrastructure Demonstrations | Demonstration | GI | Active | $635,188 | $1.3 M | 2021-07-29 |
Free the Chargers – A Shared Economy Approach to EV Charging with Constraint Grid Mitigation via Non-Wires-Alternative | Opus One Solutions | ON | Electric Vehicle Infrastructure Demonstrations | Demonstration | GI | Active | $2.0 M | $4.7 M | 2021-07-29 |
Electric Truck Charging Infrastructure Demonstration | Hydro One Limited | ON | Electric Vehicle Infrastructure Demonstrations | Demonstration | GI | Active | $4.9 M | $9.9 M | 2021-07-29 |
Charging Infrastructure with Dynamic and Distributed Price Signal for Load Shaping | Geotab Inc. | Canada | Electric Vehicle Infrastructure Demonstrations | Demonstration | GI | Active | $1.3 M | $2.8 M | 2021-07-29 |
Alectra Drive at Home | Alectra Inc. | ON | Electric Vehicle Infrastructure Demonstrations | Demonstration | GI | Active | $1.5 M | $3.3 M | 2021-07-29 |
Intelligent Electric Bus Charging | Toronto Transit Commission | ON | Electric Vehicle Infrastructure Demonstrations | Demonstration | GI | Active | $2.5 M | $5.0 M | 2021-07-29 |
Alberta Zero-Emissions Truck Electrification Collaboration (AZETEC) Fueling Station | Alberta Motor Transport Association | AB | Electric Vehicle Infrastructure Demonstrations | Demonstration | GI | Active | $2.3 M | $9.2 M | 2021-06-03 |
Nain Remote Micro Grid FEED Study | Nunatsiavut Government | NL | Clean Energy for Rural and Remote Communities, Demonstration | FEED Study | GI | Active | $1.3 M | $1.7 M | 2021-05-18 |
Marine Renewable Energy Standards Development – Supporting Canadian Priorities within IEC TC 114 |
Marine Renewables Canada | NS | Renewable Energy | R&D | EIP | Complete | $83,800 | $315,200 | 2021-05-06 |
Zibi District Thermal System | Zibi Community Utility LP | QC | Energy Efficient Buildings and Communities | Demonstration | EIP | Active | $1.0 M | $5.4 M | 2021-04-12 |
A-CAES Design and Feasibility Assessment Tools Development | Hydrostor Inc. | ON | Smart Grid and Energy Storage | R&D | EIP | Completed | $500,000 | $2.0 M | 2021-04-15 |
Next Generation EV Charging Networks | British Columbia Institute of Technology | BC | Electric Vehicle Infrastructure Demonstrations | Demonstration | GI | Active | $1.79 M | $4.1 M | 2021-05-05 |
Active Biological Countermeasures | NorQuest Systems Division | AB | Oil Spill Response Science | R&D | OSRS | Completed | $400,000 | $1.3 M | |
Development of effective and environmentally friendly formulations for the dispersion and remediation of heavy oil spilled in marine environments | University of Toronto | ON | Oil Spill Response Science | R&D | OSRS | Completed | $112,700 | $151,250 | |
Nova Scotia Vehicle Grid Integration Pilot | Nova Scotia Power Inc. | NS | Electric Vehicle Infrastructure Demonstrations | Demonstration | GI | Active | $1.1 M | $2.2 M | 2021-01-12 |
Decreasing Transactional EV Charging Costs and Enhancing Grid Efficiency | SWTCH Energy Inc. | ON | Electric Vehicle Infrastructure Demonstrations | Demonstration | GI | Active | $1.0 M | $2.6 M | 2020-11-10 |
Slemon Park Microgrid Project | PEI Energy | PEI | Smart Grid and Energy Storage | Deployment | GI | Active | $4.3 M | $24.6 M | 2020-08-13 |
Development of a new electric propulsion system adapted to the mining industry | Propulsion Québec | QC | Mining - Technology and Innovation | R & D | CGP | Active | $2.6 M | $6.1 M | 2020-11-02 |
Advanced CNC Reinforced PHA Bioplastics | TerraVerdae Bioworks Inc. | AB, ON, QC | Forestry – Technology and Innovation | R & D | CGP | Active | $2.0 M | $3.3 M | 2020-04-28 |
Yukon Electric Thermal Storage Demonstration Project | Yukon Conservation Society | YK | Clean Energy for Rural and Remote Communities, Demonstration | Demonstrarion | GI | Active | $1.6 M | $1.97 M | 2020-09-22 |
Community Clean Energy Planning, Training and Implementation Planning in Aklavik | Nihtat Energy Ltd | NT | Renewable Energy | Energy planning | IMPACT | Active | $500,000 | $518,500 | 2020-09-22 |
Community Clean Energy Planning, Training, and Implementation Planning in Deline | Deline Got’ine Government | NT | Renewable Energy | Energy planning | IMPACT | Active | $500,000 | $510,000 | 2020-09-22 |
Development of an At-Line Active Clay Analyzer for the Canadian Mining Industry | Saskatchewan Research Council | SK, AB | Mining - Technology and Innovation | R & D | CGP | Active | $1.9 M | $2.78 M | 2020-09-17 |
Use of High Pulsed Powers in improving ore concentration processes | Centre Technologique des Résidus Industriels | QC | Mining - Technology and Innovation | R & D | CGP | Active | $442,600 | $1.5 M | 2020-09-15 |
Demonstrating ECOTHOR’s Electro-Technology Performance On The Operations’ Liquid Effluents | E2Metrix Inc. | QC, BC | Mining - Technology and Innovation | Demonstration | CGP | Active | $5.1 M | $10.2 M | 2020-09-11 |
Addressing technical challenges to enable hydrokinetic clean power generation in river and coastal communities | University of Manitoba | MB, NS | Energy - Technology and Innovation | R & D | CGP | Active | $1.58 M | $2.3 M | 2020-09-09 |
Nova Tidal Array | Nova Innovation CAN Limited | NS | Energy - Technology and Innovation | Demonstration | CGP | Active | $4.0 M | $10.8 M | 2020-09-09 |
Scaling Up First Hub & Spoke Lignocellulosic Biofuels Commercial Pilot | CRB Innovations | QC | Forestry – Technology and Innovation | Demonstration | CGP | Active | $5.29 M | $15.79 M | 2020-09-08 |
Pilot plant of clean process for recycled nitrogen for precious metal recovery | COREM | QC | Mining - Technology and Innovation | R & D | CGP | Active | $2.6 M | $3.6 M | 2020-08-10 |
West 5 Smart Grid Project | London Hydro | ON | Smart Grid Demonstration and Deployment | Demonstration & Deployment | GI | Active | $5.3 M | $12.4 M | 2020-07-17 |
Affordable, Replicable and Marketable Net Zero Ready Multiple Unit Residential Buildings | Canadian Home Builders’ Association | BC, AB, SK, ON | Energy Efficient Buildings and Communities | Demonstration | GI | Active | $2.6 M | $5.7 M | 2020-06-24 |
SaskPower Distribution Modernization Program | SaskPower | SK | Smart Grid and Energy Storage, Deployment | Deployment | GI | Active | $4.7 M | $20.3 M | 2018-10-26 |
Sault Smart Grid | PUC Distribution Inc. | ON | Smart Grid and Energy Storage, Deployment | Deployment | GI | Active | $10.6 M | $42.8 M | 2019-02-11 |
Digital Utility Platform | Lakefront Utilities | ON | Smart Grid and Energy Storage, Deployment | Deployment | GI | Active | $164,153 | $656,612 | 2019-03-13 |
Smart Grid Deployment of Off-Grid Networks | Hydro-Québec | QC | Smart Grid and Energy Storage, Deployment | Deployment | GI | Active | $11.0 M | $46.2 M | 2019-08-15 |
Canada’s 1st Member-Owned Rural Smart Grid Project | EQUS REA | AB | Smart Grid and Energy Storage, Deployment | Deployment | GI | Active | $2.2 M | $9 M | 2019-08-29 |
EPCOR Smart Grid System | EPCOR | AB | Smart Grid and Energy Storage, Deployment | Deployment | GI | Active | $10.6 M | $44.2 M | 2018-11-30 |
Natural Heat Exchange Engineering Technology for Mines | Mining Innovation Rehabilitation & Applied Research Corporation | ON | Mining - Technology and Innovation | R&D | CGP | Active | $1.5 M | $2.9 M | 2020-02-11 |
The 100% electric mine - Converting the biggest diesels to electric | FVT Research Inc. | ON BC |
Energy - Technology and Innovation | R&D | CGP | Active | $2.0 M | $4.5 M | 2020-02-11 |
Powercone® Skyway8 wind farm pilot | Biome Renewables | ON | Electricity | R&D | EIP | Active | $1.9 M | $3.8 M | 2020-02-12 |
CO2 utilization in concrete: a new circular economy model | CarbonCure Technologies Inc. | NS | Manufacturing | R&D | EIP | Active | $2.0 M | $4.0 M | 2020-02-12 |
Chemical manufacturing through electrochemical carbon dioxide utilization | CERT Systems Inc. | ON | Manufacturing | R&D | EIP | Active | $1.4 M | $1.8 M | 2020-02-12 |
Development and testing of a tri-generation pyrolysis | Ekona Power Inc. | BC | Manufacturing | R&D | EIP | Active | $2.7 M | $7.7 M | 2020-02-12 |
Energy-efficient graphene-based membrane cooling systems | Evercloak Inc. | ON | Energy Efficient Buildings and Communities | R&D | EIP | Active | $900,000 | $1.28 M | 2020-02-12 |
Commercialization of lowest-cost, long duration energy storage systems | e-Zn Inc. | ON | Electricity | R&D | EIP | Active | $1.6 M | $5.8 M | 2020-02-12 |
Ultra-fast charging of lithium-ion cells for the mass global adoption of electric vehicles | GBatteries | ON | Transportation | R&D | EIP | Active | $2.7 M | $3.7 M | 2020-02-12 |
Platforms for life | Intelligent City | BC | Energy Efficient Buildings and Communities | R&D | EIP | Active | $3.0 M | $7.9 M | 2020-02-12 |
Extract energy heat engine | Smarter Alloys | ON | Electricity | R&D | EIP | Active | $1.5 M | $6.5 M | 2020-02-12 |
Demonstration of Advanced Biocatalytic Process for Low-Cost Carbon Capture | CO2 Solutions Inc. | QC | Carbon Capture, Use and Storage | R&D | EIP | Active | $375,000 | $677,000 | 2018-08-10 |
BIOSALIX: Mine Reclamation using Fabricated Soils and Organic Residuals to Augment Soil Quality | SYLVIS Environmental Services Inc. | AB | Mining - Technology and Innovation | Demonstration | CGP | Active | $3.8 M | $14.0 M | 2019-08-30 |
Novel Grinding Technology to Significantly Reduce Energy Consumption in Mining | Canada Mining Innovation Council (CMIC) | ON | Mining - Technology and Innovation | Demonstration | CGP | Active | $2.0 M | $5.1 M | 2019-08-29 |
Using Cellulosic Biomass for Wood-Plastic Composites and Rubber Reinforcement | University of Waterloo | ON | Forestry – Technology and Innovation | R&D | CGP | Active | $800,000 | $1.1 M | 2019-08-30 |
Lac Mégantic Microgrid | Hydro-Québec | QC | Smart Grids and Energy Storage, Demonstration & Deployment | Demonstration & Deployment | GI | Active | $5.38 M | $12.8 M | 2019-08-29 |
Mary’s Harbour Renewables | St. Mary’s River Energy LP | NL | Clean Energy for Rural and Remote Communities, Demonstration and Deployment | Demonstration & Deployment | GI | Active | $3.5 M | $4.9 M | 2019-08-29 |
Interoperability and Non-Wires Alternative Demonstration | Independent Electricity System Operator (IESO) | ON | Smart Grids and Energy Storage | Demonstration | GI | Active | $5.0 M | $11.0 M | 2019-08-29 |
Iqaluit Inuit Owned Land Smart Micro Grid FEED Study | Qikiqtaaluk Business Development Corporation | NU | Clean Energy for Rural and Remote Communities, Demonstration | Demonstration | GI | Active | $1.23 M | $1.28 M | 2019-08-28 |
Ethanol Production from Construction & Demolition Waste FEED Study | Woodland Biofuels Inc. | ON | Forestry – Technology and Innovation | FEED Study | CGP | Active | $2.89 M | $5.79 M | 2019-08-27 |
Prototype Testing on Oil Sands Tailings: ElectroKinetic Solutions-Dewatering Technology (EKS-DT) Project | ElectroKinetic Solutions Inc. | AB | Energy - Technology and Innovation | R&D | CGP | Active | $1.8 M | $6.5 M | 2019-08-26 |
Hybrid smart-grid solar PV and battery demonstration project | Kwikwasut'inuxw Haxwa'mis First Nation | BC | Clean Energy for Rural and Remote Communities, Demonstration | Demonstraton | GI | Active | $2.29 M | $2.5 M | 2019-08-26 |
Load Control and Future Infrastructure Need Forecasting – Network Agnostic Usage Monitoring Demonstration | Mogile Technologies Inc. | QC, BC | Electric Vehicle Infrastructure Demonstrations | Demonstraton | GI | Active | $1.1 M | $2.2 M | 2019-08-22 |
Destruction Bay Renewable Hybrid-Diesel Project | Kluane First Nation | YK | Clean Energy for Rural and Remote Communities, Demonstration | Demonstraton | GI | Active | $2 M | $4.2 M | 2019-08-26 |
Demonstration of a Central Access Option for EV Drivers for Charging Network Account Management | Mogile Technologies Inc. | Across Canada | Electric Vehicle Infrastructure Demonstrations | Demonstraton | GI | Active | $861,000 | $1.7 M | 2019-08-22 |
Affordable Zero-Emission Fail-Safe Electric Dump Valve Actuator | Linear Motion Technologies Canada | AB | Energy - Technology and Innovation | Demonstraton | CGP | Active | $2.1 M | $3.1 M | 2019-08-15 |
Gull Bay First Nation Diesel Offset Micro Grid Project | Ontario Power Generation | ON | Clean Energy for Rural and Remote Communities, Demonstration and Deployment | Demonstration | GI | Active | $2.0 M | $5.88 M | 2019-08-16 |
Electric Vehicle Automatic Parking (EVAP) | S2E Technologies Inc. | ON | Electric Vehicle Infrastructure Demonstrations | Demonstraton | GI | Active | $3.4 M | $7.2 M | 2019-08-14 |
Repurposing Used Large-Format Heavy-Duty Transit Bus Batteries for Electric Vehicle Rapid Charging | Red River College | MB | Electric Vehicle Infrastructure Demonstrations | Demonstraton | GI | Active | $60,000 | $120,000 | 2019-08-12 |
Newmarket Tay Power: Pan-Canadian Electric Bus Demonstration and Integration Trial | Newmarket Tay Power Distribution Ltd. | ON | Electric Vehicle Infrastructure Demonstrations | Demonstraton | GI | Active | $956,338 | $8.3 M | 2019-08-14 |
Rock Fragmentation with Explosive-Free Soiundless Chemial Demolition Agents | Royal Institution for the Advancement of Learning, McGill University | QC, ON | Mining - Technology and Innovation | Demonstraton | CGP | Active | $1.12 M | $2.17 M | 2019-08-07 |
EV Infrastructure Demonstration Project at Toronto Pearson Airport | Greater Toronto Airports Authority | ON | Electric Vehicle Infrastructure Demonstrations | Demonstraton | GI | Active | $491,326 | $2.2 M | 2019-07-29 |
Brampton Transit Electric Bus Demonstration and Integration Trial | The City of Brampton | ON | Electric Vehicle Infrastructure Demonstrations | Demonstraton | GI | Active | $3.5 M | $7.6 M | 2019-07-29 |
Building Envelope Technologies for Net-Zero Construction and Retrofit in Canada's Residential and Commercial Sectors | Carleton University | ON | Energy Efficient Buildings and Communities | Demonstraton | EIP | Active | $3.0 M | $5.5 M | 2019-07-26 |
Next generation actionable building energy performance metrics, data analytics, and visualization: an open-source platform | Carleton University | ON | Energy Efficient Buildings and Communities | R&D | GI | Active | $510,000 | $860,000 | 2019-07-26 |
Optical Technology to Quantify and Mitigate Methane Emissions from Casing Gas Vents and Liquid Storage Tanks | Carleton University | ON, AB, BC, QC, SK | Energy - Technology and Innovation | R&D | CGP | Active | $1.6 M | $2.6 M | 2019-07-26 |
Development of new protocols for determination of the environmental impact of mining on aquatic health | Carleton University | NT, ON | Mining - Technology and Innovation | R&D | CGP | Active | $389,870 | $4.7 M | 2019-07-26 |
High Density Solar Photovoltaic Module | Canadian Solar Solutions Inc. | ON | Renewables | Demonstraton | EIP | Complete | $7.9 M | $15.9 M | 2019-07-25 |
FEED study for a hybrid renewable energy platform for the remote community of Lutsel K'e First Nation | Denesoline Corp Ltd. | NT | Clean Energy for Rural and Remote Communities | FEED Study | GI | Active | $930,000 | $1.1 M | 2019-07-23 |
Carbon Capture, Utilization and Storage in Mine Tailings | University of British Columbia | BC, NT | Mining - Technology and Innovation | R&D | CGP | Active | $2.0 M | $3.45 M | 2019-07-23 |
Design, construction, demonstration, evaluation, and optimization of a mid-rise "Net-Zero Energy" MURB in Western Canada | UBC Properties Investments Ltd. | BC | Energy Efficient Buildings and Communities | Demonstration | GI | Active | $3.5 M | $10.9 M | 2019-07-23 |
Demonstration of an Advanced Power Distribution and Grid Integration System for EV Recharging | University of British Columbia, Clean Energy Research Centre | BC | Electric Vehicle Infrastructure Demonstrations | Demonstration | GI | Active | $2.3 M | $5.8 M | 2019-07-23 |
Smart, Proactive, Enabled, Energy Distribution; Intelligent, Efficiently, Responsive (SPEEDIER) project | Bracebridge Generation Ltd. | ON | Smart Grids and Energy Storage, Demonstration & Deployment | Demonstration & Deployment | GI | Completed | $3.7 M | $8.3 M | 2019-07-23 |
Revolutionising copper production with Jetti | Jetti Services Canada Inc. | BC | Mining - Technology and Innovation | R&D | CGP | Active | $492,500 | $985,000 | 2019-07-15 |
Geothermal Energy Co-production from an Active Oil and Gas Operation | Razor Energy Corp. | AB | Energy - Technology and Innovation | Demonstration | CGP | Active | $5.0 M | $15.5 M | 2019-06-27 |
MiGen Transactive Grid | Hydro Ottawa Limited | ON | Smart Grids and Energy Storage | Demonstration | GI | Closed | - | - | 2019-06-14 |
Tailings Management Through Nano Technologies | Carbonix Inc. | AB ON |
Mining - Technology and Innovation | Demonstration | CGP | Active | $3.15 M | $5.23 M | 2019-07-15 |
Power.House Hybrid: Minimizing GHGs and Maximizing Grid Benefits | Alectra Utilities Corporation | ON | Smart Grids and Energy Storage | Demonstration | GI | Active | $1.67 M | $3.38 M | 2019-06-21 |
The Transactive Grid – Enabling an End-To-End Market Services Framework Using Blockchain | Alectra Utilities Corporation | ON | Smart Grids and Energy Storage | Demonstration | GI | Complete | $2.62 M | $5.2 M | 2019-06-21 |
Nunavut Arctic College Student Residence Deep Energy Retrofit | Qikiqtaaluk Properties Inc. | NU | Energy Efficient Buildings and Communities | Demonstration | GI | Active | $2.05 M | $4.37 M | 2019-05-28 |
Creation of biomaterials from hydrolysis lignin | FPInnovations | ON | Forestry – Technology and Innovation | R&D | CGP | Active | $2.0 M | $4.2 M | 2019-05-27 |
Sundance Housing Rehabilitation Project | Sundance Housing Cooperative | AB | Energy Efficient Buildings and Communities | Demonstration | GI | Active | $2.5 M | $5.35 M | 2019-05-24 |
Secondary School Carbon Free Embedded MicroGrid Energy System Demonstration | Ameresco Canada Inc. | ON | Smart Grids and Energy Storage | Demonstration | EIP | Active | $4.5 M | $9.1 M | 2019-05-22 |
John Paul II High School Carbon Free Embedded Energy System FEED Study | London District Catholic School Board | ON | Renewable Energy, Smart Grids, and Storage | FEED Study | EIP | Completed | $300,000 | $600,000 | 2019-05-22 |
Dynamic Voltage Control for the Integration of Renewables | New Brunswick Power Corporation | NB | Renewable Energy, Smart Grids, and Storage | Demonstration | EIP | Active | $1.0 M | $2.507 M | 2019-05-10 |
eMVAPEX Pilot, Phase 3 | MEG Energy Corp. | AB | Energy - Technology and Innovation | Demonstration | CGP | Active | $8.0 M | $46.4 M | 2019-05-08 |
Demonstrating EV Range and Charging Efficiency in a Very Cold Climate | Yukon Government | YT | Electric Vehicle Infrastructure Demonstrations | Demonstration | GI | Active | $212,000 | $438,250 | 2019-05-03 |
Eavor-Loop Demonstration Project | Eavor Technologies Inc. | AB | Energy - Technology and Innovation | Demonstration | CGP | Active | $2.5 M | $12.1 M | 2019-04-25 |
Engineering Design for Net Zero Communities in Toronto | City of Toronto | ON | Energy Efficient Buildings and Communities | FEED Study | EIP | Active | $375,000 | $750,000 | 2019-04-24 |
In-Pit Extraction Process | Canadian Natural Resources Limited | AB | Energy - Technology and Innovation | Demonstration | CGP | Active | $8.0 M | $65.17 M | 2019-03-14 |
Residential Demand Response Program | Yukon Energy Corporation | YT | Smart Grid and Energy Storage | Demonstration | GI | Active | $709,732 | $1.4 M | 2019-04-12 |
Demonstration of Creating Value from Waste (CVW™) Sustainable Technology at Canadian Natural Horizon | Titanium Corporation Inc. | AB | Energy - Technology and Innovation | Demonstration | CGP | Active | $1.9 M | $50 M | 2019-03-14 |
Compressed Air Energy Storage for Arctic Deployment of Renewable Energy in Nunavut (FEED Study) | TUGLIQ Energy Corp | NU | Renewables | FEED Study | EIP | Completed | $283,000 | $773,000 | 2019-01-28 |
Nunavik Mining: RAGLAN 2.0 Large Scale Renewable Energy Smart Grid | TUGLIQ Energy Corp | QC | Renewables | Demonstration | EIP | Completed | $3.9 M | - | 2019-01-28 |
Integrated Dispatchable Resource Network for Local Electric Distribution Utility | The Power Commission of The City of Saint John (Saint John Energy) | NB | Smart Grids and Energy Storage | Demonstration & Deployment | GI | Active | $5.7 M | $14.3 M | 2019-01-24 |
Net-Zero Energy Mixed Use High-Rise Building | Sifton Properties Limited | ON | Energy Efficient Buildings and Communities | Demonstration | EIP | Active | $3.9 M | $57.6 M | 2019-01-21 |
Sky Smart Electric Vehicle Charging Station | Sky Solar (Canada) Ltd. | ON | Electric Vehicle Infrastructure Demonstrations | Demonstration | EIP | Active | $2.0 M | $4.0 M | 2018-11-30 |
Autonomous Discovery Accelerator for Materials Innovation | University of British Columbia | BC | Advanced Materials Innovation | Demonstration | EIP | Active | $8.0 M | $11.8 M | 2018-11-28 |
3 300 Saint-Jacques NET ZERO+ | Lemay CO Inc. | QC | Energy Efficient Buildings and Communities | Demonstration | EIP | Active | $1.0 M | $2.992 M | 2018-10-09 |
Near Net Zero Energy Supermarket | Longo Brothers Fruit Markets Inc. | ON | Energy Efficient Buildings and Communities | Demonstration | EIP | Active | $1.44 M | $11.062 M | 2018-10-09 |
Integrating Distributed Generation into Secondary Networks in Large Urban Centres | ENMAX Power Corporation | AB | Smart Grid and Storage | Demonstration | GI | Active | $2.043 M | $5.788 M | 2018-08-27 |
Occupant modelling for building design and energy codes: roadmap, feasibility study, best practices guidebook, and tested case study | Carleton University | ON | Energy Efficient Buildings and Communities | R&D | EIP | Active | $350,750 | $566,750 | 2018-08-14 |
Clayton Heights Passive House Community Centre | City of Surrey | BC | Energy Efficient Buildings and Communities | Demonstration | EIP | Active | $1.3 M | $43.5 M | 2018-08-10 |
Canada-China Collaboration on VOC and Methane Emissions Reduction | Clearstone Engineering Ltd. | Canada and China | Methane and VOC Emissions | R&D | EIP | Active | $1.6 M | $2.1 M | 2018-08-10 |
Techno-Economic Assessment of Emissions Reduction Opportunities from Canada's LNG Production System | Patro Research Ltd. | Calgary, AB | Methane and VOC Emissions | R&D | EIP | Active | $600,000 | $1.5 M | 2018-08-10 |
Assessing Forest Biomass as a Bioenergy Feedstock: The Availability and Recovery of Biomass in Uneven-aged Forests | University of Toronto | ON | Bioenergy | R&D | ecoEII | Completed | $273,000 | $814,000 | 2018-02-15 |
Bio-energy Optimization Program Demonstration | Manitoba Hydro | MB | Bioenergy | Demonstration | CEF | Completed | $2.77 M | $6.0 M | 2011-01-01 |
Biomass-based Urban Central Heating Demonstration | SSQ Société immobilière Inc. | QC | Bioenergy | Demonstration | CEF | Completed | $4.7 M | $13.3 M | 2011-01-01 |
Biomass-rich Waste Conversion into Drop-in Fuels | Enerkem Inc. | QC | Bioenergy | R&D | ecoEII | Completed | $729,000 | $1.46 M | 2012-01-01 |
Demonstration of Heat and Power from Biomass Gasification | University of British Columbia | BC | Bioenergy | Demonstration | CEF | Completed | $10.8 M | $28 M | 2011-01-01 |
Food and Yard Waste Anaerobic Digestion to Electricity Demonstration | Harvest Power Canada Ltd. | - | Bioenergy | Demonstration | CEF | Completed | $5.0 M | $22.5 M | 2011-01-01 |
Front End Engineering and Design Study (FEED) of the Kwadacha Community Energy Project | BC Bioenergy Network Association | BC | Bioenergy | FEED Study | ecoEII | Completed | $317,813 | $635,625 | 2012-01-01 |
Innovative Biomass Supply Chain Solutions for Commercial and Institutional Heating Plants Used in the Forestry Sector | Quebec Federation of Forestry Cooperatives | QC | Bioenergy | R&D | ecoEII | Completed | $604,000 | $1.0 M | 2012-01-01 |
Lignin-to-Drop-In BioJetfuels and Chemicals | CRB Innovations Inc. | QC | Bioenergy | R&D | ecoEII | Completed | $1.0 M | $1.5 M | 2012-01-01 |
Low Carbon Fuel Demonstration Pilot Plant | Lafarge Canada Inc. | ON | Bioenergy | Demonstration | ecoEII | Completed | $2.7 M | $8.9 M | 2012-01-01 |
Modular Compact Combined Heat and Power (CHP) Using Local Heterogeneous Biomass Wastes | Enerkem Inc. | AB QC |
Bioenergy | Demonstration | ecoEII | Completed | $2.9 M | $10.3 M | 2012-01-01 |
Production and Conversion of Biorefinery Cellulose to Advanced Fuels, Biochemicals and Biomaterials | Lignol Innovations Ltd. | BC | Bioenergy | R&D | ecoEII | Completed | $1.1 M | $2.63 M | 2012-01-01 |
Yukon Bioenergy Demonstration Project | Yukon Energy Corp. | YT | Bioenergy | FEED Study | ecoEII | Completed | $500,000 | $1.0 M | 2012-01-01 |
Alberta CO2 Purity Project (ACPP) | Petroleum Technology Alliance Canada | AB | Carbon Capture, Use and Storage | R&D | ecoEII | Completed | $525,000 | $955,000 | 2012-01-01 |
Atmospheric leak detection as a tool for bitumen steam chamber and oil well integrity risk analyses | Saint Francis Xavier University | NS | Carbon Capture, Use and Storage | Demonstration | ecoEII | Completed | $300,000 | $539,000 | 2012-01-01 |
Carbon Storage Onshore Nova Scotia – Injection Site Characterization | CCS Research Consortium of Nova Scotia | NS | Carbon Capture, Use and Storage | R&D | ecoEII | Completed | $4.5 M | $7.7 M | 2012-01-01 |
Development of a Pilot-scale Supercritical-CO2 Brayton Cycle Demonstration Loop | Carleton University, Mechanical Engineering | ON | Carbon Capture, Use and Storage | R&D | ecoEII | Completed | $1.4 M | $2.2 M | 2012-01-01 |
Alberta Carbon Trunk Line Carbon Capture and Storage Project | Enhance Energy | AB | Carbon Capture, Use and Storage | Demonstration | CEF | Completed | $63 M | - | 2011-01-01 |
Enzymatic Technology for Efficient Carbon Capture from Oil Sands Operations | CO2 Solutions Inc. | QC AB |
Carbon Capture, Use and Storage | R&D | ecoEII | Completed | $5.3 M | $8.5 M | 2012-01-01 |
Identification of Options for CO2 Storage in the Athabasca Area | Alberta Innovates – Technology Futures | AB | Carbon Capture, Use and Storage | R&D | ecoEII | Completed | $550,000 | $900,000 | 2012-01-01 |
Energy Quest Project | Shell Canada | AB | Carbon Capture, Use and Storage | Demonstration | CEF | Completed | $120 M | $1310 M | 2011-01-01 |
Surface Containment Monitoring for Carbon Capture and Storage | Saint Francis Xavier University | NS | Carbon Capture, Use and Storage | R&D | ecoEII | Completed | $909,000 | $1.6 M | 2012-01-01 |
Advanced Liquid Desiccant Air Handling System | Venmar CES, Inc. | SK | Energy Efficient Buildings and Communities | R&D | ecoEII | Completed | $1.38 M | $3.48 M | 2012-01-01 |
Cold Climate Air-Source Heat Pump Demonstration | Ecologix Heating Technologies Inc. | ON | Energy Efficient Buildings and Communities | Demonstration | CEF | Completed | $4.5 M | $13 M | 2011-01-01 |
Community Integrated Energy Mapping Feasibility Study: Gateway to Alberta’s Energy Demand & Supply | Climate Change Central | AB | Energy Efficient Buildings and Communities | R&D | ecoEII | Completed | $500,000 | $702,475 | 2012-01-01 |
Community-level Solar Energy Project | City of Colwood | BC | Energy Efficient Buildings and Communities | Demonstration | CEF | Completed | $2.1 M | $11.9 M | 2011-01-01 |
Energy OASIS (Open Access to Sustainable Intermittent Sources) Project | British Columbia Institute of Technology (BCIT), Applied Research Team | BC | Energy Efficient Buildings and Communities | Demonstration | CEF | Completed | $4.4 M | $9.1 M | 2011-01-01 |
High Efficiency Commercial Refrigeration Systems utilizing an Ejector | Carnot Refrigeration Inc. | QC | Energy Efficient Buildings and Communities | R&D | ecoEII | Completed | $850,000 | $2.68 M | 2012-01-01 |
Integrated Air to Water Heat Pump System for Domestic Hot Water and Space Heating for Low Energy and Net Zero Energy Housing | Sumaran Inc. | ON | Energy Efficient Buildings and Communities | R&D | ecoEII | Completed | $983,000 | $1.84 M | 2012-01-01 |
Integrated Approach to Development of a High Efficiency Energy Recovery and Intelligent Ventilation System | dPoint Technologies | BC | Energy Efficient Buildings and Communities | R&D | ecoEII | Completed | $704,000 | $939,000 | 2012-01-01 |
Integrating Renewables and Conservation Measures in a Net-Zero Energy Low-Rise Residential Subdivision | Owens Corning Canada LP | NS QC ON AB |
Energy Efficient Buildings and Communities | Demonstration | ecoEII | Completed | $1.9 M | $5.1 M | 2012-01-01 |
Intelligent Net-zero Energy Buildings | Concordia University | QC | Energy Efficient Buildings and Communities | R&D | ecoEII | Completed | $1.0 M | $1.7 M | 2012-01-01 |
Plug & Play Building-Integrated Photovoltaic and Thermal (BIPV-T) Technologies | Montréal ZERO Inc. | QC | Energy Efficient Buildings and Communities | R&D | ecoEII | Completed | $560,000 | $788,000 | 2012-01-01 |
Thermoacoustic Cogeneration Engine Development | Etalim Inc. | BC | Energy Efficient Buildings and Communities | R&D | ecoEII | Completed | $1.4 M | $4.9 M | 2012-01-01 |
A 10 MW Wind Technology Research and Development Park | Wind Energy Institute of Canada | PE | Renewables | Demonstration | CEF | Completed | $12 M | $24.8 M | 2011-01-01 |
BC Remote Community Integrated Energy BCRCIE Project | Province of British Columbia | BC | Renewables | Demonstration | ecoEII | Completed | $203,000 | $453,000 | 2012-01-01 |
Canadian Hydrokinetic Turbine Test Centre (CHTTC) | University of Manitoba | MB | Renewables | R&D | ecoEII | Completed | $2.2 M | $4.0 M | 2012-01-01 |
Community-Based Geothermal Demonstration in Remote First Nations Community | Borealis GeoPower Inc./ Acho Dene Koe First Nation | AB | Renewables | Demonstration | CEF | Completed | $469,000 | $1.14 M | 2011-01-01 |
Demonstration of Waste-Heat Recovery at Compressor Stations | Great Northern Power Corp. | AB | Renewables | Demonstration | CEF | Completed | $978,000 | $3.2 M | 2011-01-01 |
Development of Codes and Standards for Marine Energy Converters | Marine Renewables Canada Society | BC | Renewables | R&D | ecoEII | Completed | $1.2 M | $2.1 M | 2012-01-01 |
Front End Engineering and Design (FEED) Study Whapmagoostui - Wind Hybrid Power Plant | Nimschu Iskudow (NI) Inc. | QC | Renewables | FEED Study | ecoEII | Completed | $700,275 | $2.5 M | 2012-01-01 |
Front End Engineering and Design Study (FEED) for the Dent Island Tidal Power Generation Project | Water Wall Turbine Inc. | BC | Renewables | FEED Study | ecoEII | Completed | $300,000 | $600,000 | 2012-01-01 |
Front End Engineering Design (FEED) Study: Williston Basin Low Temperature Geothermal Demonstration | Deep Earth Energy Production Corp. | SK | Renewables | FEED Study | ecoEII | Completed | $1.0 M | $2.1 M | 2012-01-01 |
Front End Engineering Design Study (FEED) of Xstrata’s Raglan Renewable Electricity Micro-Grid & Smart-Grid Pilot Demonstration | TUGLIQ Energy Co. | QC | Renewables | FEED Study | ecoEII | Completed | $720,000 | $2.0 M | 2012-01-01 |
Glencore RAGLAN Mine Renewable Electricity Smart-Grid Pilot Demonstration | TUGLIQ Energy Co. | QC | Renewables | Demonstration | ecoEII | Completed | $7.8 M | - | 2012-01-01 |
Integration of deep geothermal energy in Canada's energy portfolio | Institut de recherche d’Hydro-Québec (IREQ) | QC | Renewables | R&D | ecoEII | Completed | $800,000 | $3.3 M | 2012-01-01 |
Kortright Energy Yield Test Standard | Toronto and Region Conservation Authority | ON | Renewables | R&D | ecoEII | Completed | $1.0 M | $1.4 M | 2012-01-01 |
Pan-Canadian Wind Integration Study | Canadian Wind Energy Association | ON | Renewables | R&D | ecoEII | Completed | $1.75 M | $2.75 M | 2012-01-01 |
Reducing the cost of in-stream tidal energy generation through comprehensive hydrodynamic site assessment | Acadia University | NS | Renewables | R&D | ecoEII | Completed | $1.97 M | $3.77 M | 2012-01-01 |
Tidal Energy Project in the Bay of Fundy | Fundy Ocean Research Center for Energy | NS | Renewables | Demonstration | CEF | Completed | $23 M | $50.7 M | 2011-01-01 |
VB (Virtual Blade) Wind Power | GTRenergy Ltd. | PE ON |
Renewables | R&D | ecoEII | Completed | $600,000 | $1.1 M | 2012-01-01 |
Wasdell Falls Hydro Power Project | Coastal Hydropower Corp. (Wasdell Falls LP) | ON | Renewables | Demonstration | ecoEII | Completed | $2.0 M | $14.0 M | 2012-01-01 |
Dent Island Tidal Power Generation Project | Water Wall Turbine Inc. | BC | Renewables | Demonstration | CEF | Completed | $2.25 M | $5.17 M | 2011-01-01 |
West Coast Wave Initiative (WCWI) | University of Victoria | BC | Renewables | R&D | ecoEII | Completed | $1.93 M | $3.77 M | 2012-01-01 |
Wind and Storage Demonstration in a First Nations Community | Cowessess First Nation | SK | Renewables | Demonstration | CEF | Completed | $2.78 M | $6.85 M | 2011-01-01 |
British Columbia Electric Vehicle Smart Infrastructure Project | BC Hydro | BC | Smart Grid and Storage | Demonstration | ecoEII | Completed | $4.1 M | $8.39 M | 2012-01-01 |
Commercial Demonstration of a Management System for Electrical Vehicle Charging Station Networks | AddÉnergie Technologies Inc. | QC | Smart Grid and Storage | Demonstration | ecoEII | Completed | $4.5 M | $31 M | 2012-01-01 |
Development of a Utility Grade Controller for Remote Microgrids with High Penetration Renewable Generation | Hatch Ltd. | ON | Smart Grid and Storage | R&D | ecoEII | Completed | $2.2 M | $3.48 M | 2012-01-01 |
Direct-Current (DC) Arc-Free Circuit Breaker for Utility-Grid Battery Storage System | University of Toronto | ON | Smart Grid and Storage | R&D | ecoEII | Completed | $560,000 | $1.08 M | 2012-01-01 |
Electricity Load Control Demonstration | New Brunswick Power Corporation | PE NB NS |
Smart Grid and Storage | Demonstration | CEF | Completed | $15.6 M | $32 M | 2011-01-01 |
Energy Management Business Intelligence Platform Development and Demonstration | Power Measurement Ltd. | ON AB BC |
Smart Grid and Storage | Demonstration | CEF | Completed | $3.6 M | $10 M | 2011-01-01 |
Integrated Urban Community Energy Project | Opus One Solutions Energy Corporation | ON | Smart Grid and Storage | Demonstration | ecoEII | Completed | $5.3 M | $12.6 M | 2012-01-01 |
Interactive Smart Zone Demonstration in Québec | Hydro-Québec | QC | Smart Grid and Storage | Demonstration | CEF | Completed | $7.5 M | $49.8 M | 2011-01-01 |
Iqaluit Smart Grid | Qulliq Energy Corporation | NU | Smart Grid and Storage | Demonstration | ecoEII | Completed | $1.3 M | $2.7 M | 2012-01-01 |
Managing Energy Storage Capacities Dispersed in an Electrical Grid to Reduce the Effects of Renewable Energy Source Variability | La Corporation de l’École Polytechnique de Montréal | QC | Smart Grid and Storage | R&D | ecoEII | Completed | $1.1 M | $1.5 M | 2012-01-01 |
Powering Plug-In Electric Vehicles with Renewable Energy Supply in BC | University of Victoria | BC | Smart Grid and Storage | R&D | ecoEII | Completed | $600,000 | $1.68 M | 2012-01-01 |
Energy Storage and Demand Response for Near-Capacity Substation | BC Hydro | BC | Smart Grid and Storage | Demonstration | CEF | Completed | $6.49 M | $13.49 M | 2011-01-01 |
Utility Scale Electricity Storage Demonstration Using New and Re-purposed Lithium Ion Automotive Batteries | Electrovaya Corp | ON | Smart Grid and Storage | Demonstration | CEF | Completed | $3.66 M | $7.6 M | 2011-01-01 |
Prolucid Technologies for Distributed Generation Monitoring and Control | Prolucid Technologies Inc. | ON | Smart Grid and Storage | Demonstration | ecoEII | Completed | $2.85 M | $6.59 M | 2012-01-01 |
Developing Electrical Safety Standards to Introduce Electric Vehicles into Canada | CSA Group | ON | Transportation | R&D | ecoEII | Completed | $1.9 M | $3.1 M | 2012-01-01 |
Development of Thick Film Electric Heaters for Thermal Modulation of Battery Systems | Dana Canada Corporation | ON | Transportation | R&D | ecoEII | Completed | $1.19 M | $1.66 M | 2012-01-01 |
Electric Mobility Adoption and Prediction Tool | The Pollution Probe Foundation | ON | Transportation | R&D | ecoEII | Completed | $1.0 M | $1.5 M | 2012-01-01 |
High Energy Density Energy Storage for Automotive Applications | University of Waterloo | ON | Transportation | R&D | ecoEII | Completed | $1.87 M | $2.67 M | 2012-01-01 |
Improved Fluxless Aluminum Brazing Materials and Process Technology for Manufacturing of Advanced Battery Cooling Heat Exchangers | Dana Canada Corporation | ON | Transportation | R&D | ecoEII | Completed | $1.86 M | $2.66 M | 2012-01-01 |
Low Cost Wheel Motors for Electric and Hybrid Electric Vehicles | TM4 Inc. | QC | Transportation | R&D | ecoEII | Completed | $3.7 M | $5.68 M | 2012-01-01 |
Applying Duplex Wave Migration (DWM) and Seismic Modelling Technology to Delineate Steam Assisted Gravity Drainage process Steam Chambers and Reduce CO2 Emissions | TetraSeis Inc. | AB | Unconventional Oil and Gas | R&D | ecoEII | Completed | $1.17 M | $1.76 M | 2012-01-01 |
Canada-Israel Energy Science & Technology Fund | Canada-Israel Industrial R&D Foundation | ON | Unconventional Oil and Gas | R&D | ecoEII | Completed | $5.0 M | $11.7 M | 2012-01-01 |
Dewatering Wet Tailings Generated From Oil Sands Extraction | University of Alberta | AB | Unconventional Oil and Gas | R&D | ecoEII | Completed | $859,000 | $2.17 M | 2012-01-01 |
Emissions Reductions and Energy Efficiency in Crude Bitumen and Heavy Oil | Petroleum Technology Allicance Canada (PTAC) | AB | Unconventional Oil and Gas | R&D | ecoEII | Completed | $387,000 | $886,000 | 2012-01-01 |
Enhancements to an Online Steam Analyser for Thermally Enhanced Heavy Oil Recovery | Petroleum Technology Allicance Canada (PTAC) | AB | Unconventional Oil and Gas | R&D | ecoEII | Completed | $1.0 M | $2.06 M | 2012-01-01 |
Fundamentals of Non-Aqueous Extraction of Oilsands | University of Alberta | AB | Unconventional Oil and Gas | R&D | ecoEII | Completed | $998,000 | $1.41 M | 2012-01-01 |
Inline Dewatering of Oil Sands Tailings, InLine Dewatering Limited | InLine Dewatering Limited | AB | Unconventional Oil and Gas | R&D | ecoEII | Completed | $759,000 | $2.1 M | 2012-01-01 |
Low Grade Heat Driven Produced Water Treatment | Saltworks Technologies Inc. | BC | Unconventional Oil and Gas | R&D | ecoEII | Completed | $3 M | $5.78 M | 2012-01-01 |
Novel Water Treatment Technology for Application to Hydraulic Fracturing | Petroleum Technology Alliance Canada (PTAC) | AB | Unconventional Oil and Gas | R&D | ecoEII | Completed | $387,500 | $743,000 | 2012-01-01 |
Online Water Analysis in Thermally Enhanced Heavy Oil Recovery | Agar Canada Corporation | AB | Unconventional Oil and Gas | R&D | ecoEII | Completed | $900,000 | $1.89 M | 2011-01-01 |
Proppant Surface Treatment and Well Stimulation for Tight Oil and Shale Gas Development | Petroleum Technology Allicance Canada (PTAC) | AB | Unconventional Oil and Gas | R&D | ecoEII | Completed | $217,000 | $965,000 | 2012-01-01 |
Submerged Combustion Vaporizer for Heating and Pressurizing Hydrocarbon Reservoirs | Combustions Solutions Inc. | AB | Unconventional Oil and Gas | R&D | ecoEII | Completed | $2.14 M | $4.69 M | 2012-01-01 |
Technical and Economic Benefits of Gas Injection in Steam-Assisted Gravity Drainage (SAGD) Wind Down | Petroleum Technology Alliance Canada (PTAC) | AB | Unconventional Oil and Gas | R&D | ecoEII | Completed | $97,500 | $238,000 | 2012-01-01 |
Understanding Oil Sands Tailings Treatment at Nano, Micro and Macro-Scales with Increased Water Recycling/Reuse | University of Alberta | AB | Unconventional Oil and Gas | R&D | ecoEII | Completed | $377,200 | $759,200 | 2012-01-01 |
Understanding the Fate of Non-recovered Fracturing Water and the Source of Produced Salts for Optimizing Fracking Operations | University of Alberta | AB | Unconventional Oil and Gas | R&D | ecoEII | Completed | $450,000 | $770,000 | 2012-01-01 |
Air-to-Fuels Development, Feasibility, and pre-FEED Study for First Commercial-Scale Demonstration Plant | Carbon Engineering Ltd. | BC | Carbon Capture, Use and Storage | FEED Study | EIP | Active | $2.25 M | $7.89 M | 2017-12-17 |
Carbon Nanoplatelet (CNP) Production from Exhaust CO2 Emissions | Carbon Upcycling Technologies Inc. |
AB | Carbon Capture, Use and Storage | R&D | EIP | Active | $3.3 M | $7.8 M | 2017-12-17 |
VeloxoTherm™ CO2 Capture Process Demonstration | Inventys Thermal Technologies Incorporated | SK | Carbon Capture, Use and Storage | Demonstration | EIP | Active | $2.6 M | $15.2 M | 2017-12-17 |
CO2 Conversion to Methanol | Quantiam Technologies Inc. | AB | Carbon Capture, Use and Storage | R&D | EIP | Active | $3.15 M | $4.9 M | 2017-12-17 |
Harmonized Methane Emission Platform | Alberta Energy Regulator | AB | Methane and VOC Emissions | Demonstration | EIP | Active | $1.27 M | $3.75 M | 2017-11-14 |
Greenhouse Gas Inventory System for the Upstream Oil and Gas Industry | Clearstone Engineering Ltd. | AB | Methane and VOC Emissions | R&D | EIP | Active | $730,000 | $1.2 M | 2017-11-14 |
A Tool for Design and Analysis of Vapour Collection and Control Systems (VCCSs) | Clearstone Engineering Ltd. | AB | Methane and VOC Emissions | R&D | EIP | Active | $430,000 | $800,000 | 2017-11-14 |
Assessing methane emissions from legacy fossil resources in Atlantic Canada | Dalhousie University | NS NB |
Methane and VOC Emissions | R&D | EIP | Active | $482,200 | $777,550 | 2017-07-28 |
Advanced Methane Detection, Analytics and Mitigation Project | Petroleum Technology Alliance Canada (PTAC) | AB SK |
Methane and VOC Emissions | Demonstation | EIP | Active | $668,000 | $1.4 M | 2017-11-14 |
Area Methane Detection Using Work Trucks | Petroleum Technology Alliance Canada (PTAC) | AB | Methane and VOC Emissions | Demonstration | EIP | Active | $300,000 | $640,030 | 2017-11-14 |
Field Assessment of Subsurface Migration, Groundwater Impacts and Fate of Fugitive Methane from Energy Resource Development in a Northeastern British Columbian Setting | University of British Columbia | BC | Methane and VOC Emissions | R&D | EIP | Active | $1.6 M | $2.4 M | 2017-11-14 |
Mobile Methane Sensing Analytics for Emissions Reduction | University of Calgary | AB | Methane and VOC Emissions | R&D | EIP | Active | $300,000 | $400,000 | 2017-11-14 |
Canada’s Geothermal Village – “Sustainaville” GeoPark | Borealis GeoPower Inc. | BC | Renewable Energy, Smart Grids and Storage | Demonstration | EIP | Completed | $1.32 M | $2.64 M | 2018-04-10 |
Canadian Small Modular Reactor (SMR) Roadmap | Canadian Nuclear Association | ON | Renewable Energy, Smart Grids and Storage | Roadmap | EIP | Active | $224,408 | $520,000 | 2018-02-22 |
Power Simulator (SimP): experimentation and standardization infrastructure for smart grid technologies | Hydro-Québec Research Institute (IREQ) | QC | Renewable Energy, Smart Grids and Storage | Demonstration | EIP | Active | $949,000 | $2.1 M | 2018-05-17 |
Advancements in environmental technologies for tidal energy development | Offshore Energy Research Association of Nova Scotia | NS | Renewable Energy, Smart Grids and Storage | R&D | EIP | Active | $1.0 M | $2.5 M | 2017-06-22 |
Demonstration of new generation integrated smart infrastructures for charging electric vehicles | AddÉnergie Technologies Inc. | Across Canada | Electric Vehicle Infrastructure Demonstrations | Demonstration | EIP | Active | $6.7 M | $16.9 M | 2017-02-22 |
High Voltage Utility Connected Level 2 Electric Vehicle Charging Demonstration | British Columbia Hydro and Power Authority | BC | Electric Vehicle Infrastructure Demonstrations | Demonstration | EIP | Active | $1.2 M | $2.4 M | 2018-02-23 |
Next Generation EV Charging Infrastructure | British Columbia Institute of Technology (BCIT) | BC | Electric Vehicle Infrastructure Demonstrations | Demonstration | EIP | Active | $1.04 M | $2.1 M | 2018-02-23 |
Enhanced Charging Infrastructure Via Vehicle-Side Data | CrossChasm Technologies Inc. | Across Canada | Electric Vehicle Infrastructure Demonstrations | Demonstration | EIP | Active | $3.25 M | $6.9 M | 2018-05-01 |
EV Charging Stations across Trans-Canada Highway (TCH) | eCAMION | ON MB |
Electric Vehicle Infrastructure Demonstrations | Demonstration | EIP | Completed | $3.5 M | $11.3 M | 2017-07-17 |
TransLink Electric Bus Demonstration and Integration Trial | TransLink | BC | Electric Vehicle Infrastructure Demonstrations | Demonstration | EIP | Active | $1.2 M | $7.8 M | 2018-04-12 |
Novel Hot Solvent Extraction Process | Cenovus FCCL Ltd. | AB | Unconventional Oil & Gas | Demonstration | OGCT | Active | $7.5 M | $23.2 M | 2018-05-11 |
Pilot Facility for Scale Up and Testing Carbon Capture and Conversion Technologies | CMC Research Institutes | BC | Carbon Capture, Use and Storage | Demonstration | OGCT | Active | $950,000 | $2.16 M | 2017-09-14 |
Clean Seas FEED Project | Field Upgrading Limited | AB | Unconventional Oil and Gas | FEED Study | OGCT | Active | $3.56 M | $16.5 M | 2018-05-11 |
Hydrogen-Donor Diluent Reduction (HDR) | Husky Oil Operations Limited | AB | Unconventional Oil and Gas | Demonstration | OGCT | Active | $9.4 M | $24.8 M | 2017-12-17 |
Carbon Conversion Technology Centre | InnoTech | AB | Carbon Capture, Use and Storage | Demonstration | OGCT | Active | $9.8 M | $22 M | 2017-03-03 |
Enhanced Modified VAPour EXtraction R&D Operation | MEG Energy Corp | AB | Unconventional Oil and Gas | Demonstration | OGCT | Active | $9.9 M | $56.9 M | 2018-05-11 |
FEED Study for HYGENERATOR | Proton Technologies Canada Inc. | AB | Unconventional Oil and Gas | FEED Study | OGCT | Active | $375,000 | $750,000 | 2017-12-17 |
Combined Direct Contact Steam Generation and Non Aqueous Extraction Demonstration | Suncor Energy Oil Sands Limited Partnership | AB | Unconventional Oil and Gas | Demonstration | OGCT | Active | $7.8 M | $24.7 M | 2017-12-17 |
Advanced Membrane-Based Hybrid Process for Oil Spill Removal in Marine Environments | University of Alberta | AB | Oil Spill Response Science | R&D | OSRS | Completed | $600,000 | $1.65 M | 2017-12-08 |
The Development of Hybrid Rapid Response Agents to Mitigate the Impact of Oil Spills in Marine Environments | BC Research Inc. | BC | Oil Spill Response Science | R&D | OSRS | Completed | $1.89 M | $2.62 M | 2017-12-08 |
Development of an Integrated Mechanical Recovery and Oil Spill Response System for Heavy Oil in Cold and Ice Prone Marine Environments | Centre for Cold Ocean Resources Engineering | NL | Oil Spill Response Science | R&D | OSRS | Completed | $991,505 | $1.9 M | 2018-01-10 |
Development of In-Situ Foam Filtration System for Oil Spill Recovery | University of Toronto | ON | Oil Spill Response Science | R&D | OSRS | Completed | $400,000 | $807,000 | 2018-01-10 |
NB Power - Collaborative Grid Innovation for Atlantic Smart Energy Communities | NB Power Corporation | NB | Smart Grid and Energy Storage | Demonstration | GI | Active | $6.2 M | $29.5 M | 2019-06-12 |
Demonstration of a manufacturing process for biocarbon briquettes for the metallurgical industry | Elkem Metal Canada | QC | Forestry – Technology and Innovation | Demonstration | CGP | Active | $5.0 M | $18.8 M | 2020-09-08 |
Borden 'Mine of the Future' Energy Innovations | Newmont Corporation (Goldcorp Canada Ltd.) | ON | Mining - Technology and Innovation | Demonstration | CGP | Active | $5.0 M | $37.1 M | 2018-10-29 |
Codes and Standards for the Zero-Emission Vehicle Sector in Canada | CSA Group | ON | Transportation | R & D | GI | Active | $1.7 M | $2.2 M | 2020-09-18 |
Community Clean Energy Planning, Training and Implementation Planning in NunatuKavut | NunatuKavut Community Council Inc. | NL | Renewable Energy | Energy planning | Impact | Active | $500,000 | $622,000 | 2020-12-21 |
Community Clean Energy Planning, Training and Implementation Planning in Haida Gwaii | Haida Enterprise Corporation | BC | Renewable Energy | Energy planning | Impact | Active | $500,000 | $500,000 | 2020-12-21 |
Community Clean Energy Planning, Training and Implementation Planning in Kugaaruk | Hamlet of Kugaaruk | NU | Renewable Energy | Energy planning | Impact | Active | $500,000 | $501,700 | 2020-12-21 |
Community Clean Energy Planning, Training and Implementation Planning in Gjoa Haven | Hamlet of Gjoa Haven | NU | Renewable Energy | Energy planning | Impact | Active | $500,000 | $550,000 | 2020-12-21 |
Community Clean Energy Planning, Training and Implementation Planning in Kinoosao | Jobb Developments | SK | Renewable Energy | Energy planning | Impact | Active | $500,000 | $570,000 | 2020-12-21 |
Community Clean Energy Planning, Training and Implementation Planning in Coral Harbour and Naujaat | Sakku Investments Corporation | NU | Renewable Energy | Energy planning | Impact | Active | $500,000 | $500,000 | 2020-12-21 |
Community Clean Energy Planning, Training and Implementation Planning in Nuxalk Nation | Nuxalk Nation | BC | Renewable Energy | Energy planning | Impact | Active | $500,000 | $535,000 | 2020-12-21 |
Community Clean Energy Planning, Training and Implementation Planning in Kuujjuaq | Societe Kuujjuamiut Inc. | QC | Renewable Energy | Energy planning | Impact | Active | $500,000 | $541,580 | 2020-12-21 |
Community Clean Energy Planning, Training and Implementation Planning in Heiltsuk First Nation | Heiltsuk Economic Development Corporation | BC | Renewable Energy | Energy planning | Impact | Active | $500,000 | $530,000 | 2020-12-21 |
Community Clean Energy Planning, Training and Implementation Planning in Fort McPherson | Teetl'it Gwich'in Band Council | NT | Renewable Energy | Energy planning | Impact | Active | $500,000 | $500,000 | 2020-12-21 |
Community Clean Energy Planning, Training and Implementation Planning in Taloyoak | Aqqaq's Clean Energy Enterprise | NU | Renewable Energy | Energy planning | Impact | Active | $500,000 | $510,000 | 2020-12-21 |
Community Clean Energy Planning, Training and Implementation Planning in Nunatsiavut | Nunatsiavut Government | NT | Renewable Energy | Energy planning | Impact | Active | $500,000 | $574,000 | 2020-12-21 |
Beaufort Delta Renewable Resource Plan | Nihtat Energy Ltd. | NT | Renewable Energy | Energy planning | Impact | Active | $800,000 | $2.6 M | 2021-01-19 |
Next Generation Ultra Fast EV Charging Infrastructure | Hydro Québec | QC | Electric Vehicle Infrastructure Demonstrations | Demonstration | GI | Active | $1.2 M | $3.09 M | 2021-07-28 |
Alberta Biojet Initiative (ABI): Upgrading of University of Alberta's LTH technology to Biojet | University of Alberta | AB | Bioenergy | R&D | EIP | Active | $2.89 M | $7.4 M | 2021-03-31 |
Arviat Clean Energy Microgrid FEED Study | NRStor Inc. | NU | Clean Energy for Rural and Remote Communities, Demonstration | Demonstration | GI | Active | $757,821 | $884,174 | 2021-04-06 |
Sanikiluaq High Displacement Renewable Energy | Qikiqtaaluk Business Development Corporation | NU | Clean Energy for Rural and Remote Communities, Demonstration | Demonstration | GI | Active | $7.3 M | $14.3 M | 2021-04-06 |
Atmospheric Plasma Technologies Towards Elimination of Cyanides from Gold Extraction Processes | Laval University | QC | Mining - Technology and Innovation | R&D | CGP | Active | $730,096 | $1.0 M | 2021-04-15 |
FortisAlberta Waterton Energy Storage | FortisAlberta Inc. | AB | Smart Grid and Energy Storage | Deployment | GI | Active | $495,000 | $4.9 M | 2021-03-17 |
Conservation Voltage Reduction | Entegrus Powerlines Inc. | ON | Smart Grid and Energy Storage | Deployment | GI | Active | $75,343 | $301,371 | 2021-03-19 |
Conservation Voltage Reduction (CVR) Deployment in Lethbridge Electric Utility (LEU) Distribution Network | City of Lethbridge | AB | Smart Grid and Energy Storage | Deployment | GI | Complete | $398,250 | $1,175,653 | 2021-03-19 |
eLeapPower R&D Collaboration with Purolator, Bell Canada & Cornerstone Hydro-Electric Concepts | eLeapPower | ON | Transportation | Demonstration | EIP | Active | $3.0 M | $7.6 M | 2020-02-12 |
EV Charging Infrastructure in Apartment, Commercial/Office and Retail Store Environments | Anvil Crawler Development Corp. | ON | Electric Vehicle Infrastructure Demonstrations | Demonstration | GI | Active | $2.3 M | $6.7 M | 2021-07-27 |
Hybrid Diesel-Electric Forestry Harvesting Trucks | FPInnovations | QC, BC | Forestry – Technology and Innovation | Demonstration | CGP | Active | $1.4 M | $2.17 M | 2021-07-29 |
Modelling Net-Zero with the Institut de l'énergie Trottier | La Corporation de L'école Polytechnique de Montréal, Institut de l'énergie Trottier | QC | National Energy Systems Modelling | Energy planning | EIP | Completed | $64,000 | $154,000 | 2021-11-12 |
Lafarge Canada Low Carbon Fuel Technology Expansion | Lafarge Canada Inc | BC, NS | Industry | Demonstration | EIP | Completed | $1.98 M | $18.5 M | 2022-02-24 |
Metal-Free Rechargeable CO2 Flow Battery: A Novel Technology for Renewable Energy Storage | Agora Energy Technologies Ltd | BC | Technology and Innovation | RD&D | Impact | Active | $770,000 | $1,332,000 | 2020-07-21 |
Nordic Battery Pack with Advanced Thermal Management and Data-Driven Battery Management System | Calogy Solutions Inc. | QC | Technology and Innovation | RD&D | Impact | Active | $770,000 | $907,000 | 2020-07-21 |
Commercialization of Lowest-Cost, Long Duration Energy Storage Systems | e-Zinc | ON | Technology and Innovation | RD&D | Impact | Active | $1,770,000 | $5,242,291 | 2022-03-30 |
Reducing the Cost of Lithium-Ion Battery Manufacturing | GBatteries Energy Canada | ON | Technology and Innovation | RD&D | Impact | Active | $770,000 | $781,445 | 2020-07-21 |
Safe and Long-Lasting Zinc-Ion Batteries for Energy Storage | Salient Energy Inc. | NS | Technology and Innovation | RD&D | Impact | Active | $770,000 | $1,016,244 | 2020-07-21 |
DEMOCRASI Project – Dispatchable Energy Market Optimized Constraint Real-time Aggregated System Interface | Bracebridge Generation | ON | Smart Grid and Energy Storage | RD&D | Impact | Active | $3,150,000 | $4,110,104 | 2019-06-20 |
Alba Nova Project: A Smart Grid Pilot Using Advanced Battery Storage | Equilibrium Engineering | NS | Smart Grid and Energy Storage | RD&D | Impact | Active | $4,017,471 | $4,142,471 | 2022-03-30 |
L2L (London Ontario to London UK) | London Hydro | ON | Smart Grid and Energy Storage | RD&D | Impact | Active | $3,150,000 | $3,934,000 | 2019-06-20 |
Ultra-low Carbon Intensity SAF made from Air, Water and Renewable Electricity | Carbon Engineering | BC | Technology and Innovation | RD&D | Impact | Active | $2,150,000 | $2,676,505 | 2019-05-29 |
Sustainable Aviation Fuels from Agro and Forestry Biomass and from Municipal Solid Waste through a Hub and Spoke Approach | Enerkem Inc. | QC | Technology and Innovation | RD&D | Impact | Active | $2,000,000 | $2,700,000 | 2022-03-30 |
Lipid-to-Hydrocarbon Biojet Project | FORGE Hydrocarbons | QC | Technology and Innovation | RD&D | Impact | Active | $2,150,000 | $2,292,552 | 2019-05-29 |
Production of Sustainable Aviation Fuel from flue gas–captured CO2 and low-carbon hydrogen | SAF+ Consortium | QC | Technology and Innovation | RD&D | Impact | Active | $2,150,000 | $3,000,000 | 2019-05-29 |
Williston Basin Geothermal Power Generation | DEEP Earth Energy Production Corp | SK | Renewable Energy | FEED Study | EIP | Completed | $350,000 | $3.4 M | 2019-01-11 |
Dispersa | Nivatha Balendra, Dispersa | QC | Cleantech | R&D | Impact | Complete | $921, 851 | N/A | 2021-11-30 |
Evercloak | Evelyn Allen, Evercloak | ON | Cleantech | R&D | Impact | Complete | $921, 851 | N/A | 2021-11-30 |
Genecis | Luna Yu, Genecis | ON | Cleantech | R&D | Impact | Complete | $921, 851 | N/A | 2021-11-30 |
Open Ocean Robotics | Julie Angus, Open Ocean Robotics | BC | Cleantech | R&D | Impact | Complete | $921, 851 | N/A | 2021-11-30 |
Solistra | Alexandra Tavasoli, Solistra | ON | Cleantech | R&D | Impact | Complete | $921, 851 | N/A | 2021-11-30 |
Summit Nanotech | Amanda Hall, Summit Nanotech | AB | Cleantech | R&D | Impact | Complete | $1.9 M | N/A | 2021-11-30 |
ReCover Initiative: Panelized Deep Energy Retrofits of Municipal Buildings | RSI Projects Inc. | NS | Energy Efficient Buildings and Communities | Demonstration | GI | Active | $526,785 | $1,093,062 | 2022-11-16 |
Nanostructured Anti-reflection Glass for Solar Panels | Edgehog Advanced Technologies | QC | Smart Grid and Energy Storage | Demonstration | EIP | Completed | $750,000 | $1.8 M | 2022-11-10 |
Southeast Saskatchewan CCUS Hub | Whitecap Resources Inc. | SK | Carbon Capture, Use and Storage | FEED Study | EIP | Active | $4,428,000 | $10,664,000 | 2023-09-27 |
Minnedosa Ethanol Plant CO2 Sequestration | Cenovus Energy Inc. | MB | Carbon Capture, Use and Storage | FEED Study | EIP | Active | $3,000,000 | $7,969,607 | 2023-09-27 |
Enhance Central Alberta Carbon Sequestration Hub Technical Feasibility | Enhance Energy Inc. | AB | Carbon Capture, Use and Storage | FEED Study | EIP | Active | $5,000,000 | $10,790,953 | 2023-09-27 |
Hinton Pulp Beccs for Negative Emissions FEED Study | Vault 44.01 Ltd. | AB | Carbon Capture, Use and Storage | FEED Study | EIP | Active | $5,300,000 | $15,575,000 | 2023-09-27 |
FEED study of Svante's Carbon Capture Technology for Suncor's Fluid Catalytic Cracker Flue Gas | Suncor Energy Inc. | AB | Carbon Capture, Use and Storage | FEED Study | EIP | Active | $4,000,000 | $13,396,287 | 2023-09-27 |
Oil Sands CCUS: Pathways Alliance | Canada Natural on behalf of Pathways Alliance | AB | Carbon Capture, Use and Storage | FEED Study | EIP | Active | $7,000,000 | $35,200,000 | 2023-09-27 |
Project Clear Horizon | City of Medicine Hat | AB | Carbon Capture, Use and Storage | FEED Study | EIP | Active | $5,000,000 | $13,259,750 | 2023-09-27 |
Lindbergh Semi-Closed Cycle Flue Gas Recirculation and Carbon Capture | Strathcona Resources LTD. | AB | Carbon Capture, Use and Storage | FEED Study | EIP | Active | $3,238,050 | $6,476,100 | 2023-09-27 |
Heat Integrated Carbon Capture and Storage at a Potash Mine | K+S Potash Canada | SK | Carbon Capture, Use and Storage | FEED Study | EIP | Active | $1,727,011 | $3,454,025 | 2023-09-27 |
Canadian Battery Innovation Centre | Dalhousie University | NS | Batteries | R&D | EIP | Active | $8,150,852 | $18,282,924 | 2024-07-31 |
Development of High Temperature Steam/CO2 Electrolysis Towards Clean Fuels Manufacturing | Canadian Nuclear Laboratories LTD | ON | Cleantech | R&D | Energy Innovation Program | Active | $ 1,000,000 | $ 2,209,495 | 2024-08-21 |