NRCan 2020-25 Integrated Audit and Evaluation Plan Summary
Acronyms
- Acronym
- Details
- ADM
- Assistant Deputy Minister
- AEB
- Audit and Evaluation Branch
- CAEE
- Chief Audit and Evaluation Executive
- CERRC
- Clean Energy for Rural and Remote Communities
- CFS
- Canadian Forest Service
- CMSS
- Corporate Management & Services Sector
- CPS
- Communications Portfolio Sector
- DAC
- Departmental Audit Committee
- DM
- Deputy Minister
- DRF
- Departmental Results Framework
- ECCC
- Environment and Climate Change Canada
- ETS
- Energy Technology Sector
- FAA
- Financial Administration Act
- FRA
- Fraud Risk Assessment
- FY
- Fiscal Year
- GBA+
- Gender-Based Analysis
- GI
- Green Infrastructure
- IA
- Internal Audit
- IAA
- Impact Assessment Agency
- IAEP
- Integrated Audit and Evaluation Plan
- IARS
- Indigenous Affairs and Reconciliation Sector
- IIA
- Institute of Internal Auditors
- IM
- Information Management
- IT
- Information Technology
- LCES
- Low Carbon Energy Sector
- LMS
- Land and Minerals Sector
- M
- Million
- MPMO
- Major Projects Management Office
- N/A
- Non Available
- OCG
- Office of the Comptroller General
- OCS
- Office of the Chief Scientist
- OPI
- Office of Primary Interest
- SPI
- Strategic Policy and Innovation Sector
- SPPIO
- Strategic Petroleum and Policy Investment Office
- TB
- Treasury Board of Canada
- TBC
- To be Confirmed
- TBD
- To Be Determined
- TBS
- Treasury Board Secretariat
- TC
- Transport Canada
Introduction
The Integrated Audit and Evaluation Plan (IAEP), also referred to as the “Plan”, is prepared by the Audit and Evaluation Branch (AEB) of Natural Resources Canada (NRCan). It contains details on the roles of internal audit, evaluation, the AEB’s planning methodology, and the planned projects for fiscal years (FY) 2020-21 to 2024-25.
The Plan provides a roadmap outlining AEB’s future activity. However, consistent with emerging innovations in the respective disciplines, we strive to remain agile in monitoring and adapting to the changing context and environment of our work. Risk assessment and engagement with clients and partners is a continual activity. As new risks are identified, AEB may find it necessary to modify the Plan in consultation with senior management.
The IAEP is developed in accordance with the requirements of the Treasury Board of Canada (TB) Policy on Internal Audit, related directives and guidelines, the Institute of Internal Auditors’ (IIA) International Standards for the Professional Practice of Internal Auditing, Section 42.1 of the Financial Administration Act (FAA), and the TB Policy on Results.
Planning Results: Audit, Evaluation, and Joint Projects for 2020-25
Tables 1 through 3 summarize the internal audit projects, joint audit and evaluation projects, and evaluations planned for the FYs 2020-21 to 2024-25. In total, 71 AEB projects of high priority are planned for the next five years.
Project type | 2020-21 | 2021-22 | 2022-23 | 2023-24 | 2024-25 |
---|---|---|---|---|---|
Audit Projects | 5 | 6 | 5 | 4 | 3 |
Evaluation Projects | 3 | 8 | 6 | 5 | 5 |
Joint Audit and Evaluation Projects | 3 | 4 | 5 | 4 | 4 |
Total | 11 | 18 | 16 | 13 | 12 |
Assurance Engagements (6 projects) |
---|
Annual Continuous Audit Report (CMSS) |
Management of NRCan's Communication Function (CPS) |
Classification (CMSS – All Sectors) |
Implementation of NRCan’s Open Government Strategy (CMSS – All Sectors) |
NRCan’s Nuclear Energy Policy Activities (LCES) |
Project Management (CMSS) |
Evaluation Projects (12 projects) |
Major Projects Management Initiative (MPMO) |
Energy and Climate Change Policy (LCES) |
Horizontal Clean Growth and Climate Change - International Cooperation (ECCC-Led, LCES, CFS) |
Geoscience to Keep Canada Safe (LMS) |
Climate Change Adaptation (LMS) |
Clean Growth Hub (SPI) |
Clean Growth Funding Program (ETS) |
Horizontal Genomics Research and Development Initiative (NRC lead)(CFS) |
Targeted Geoscience Initiative Phase 5 (LMS) |
Energy Efficiency Program (LCES) |
Electricity Resources: Renewable Energy (LCES) |
Horizontal Corporate Social Responsibility (GAC lead) (SPI, LMS) |
Joint Audit and Evaluation Projects (4 projects) |
Polar Continental Shelf Program (LMS) |
NRCan’s Departmental Governance (SPI, CMSS – All Sectors) |
Transition to the Departmental Results Framework (SPI – All Sectors) |
Impact Canada Clean Technology Stream (ETS) |
Table 3 – AEB Projects for Fiscal Years 2020-25
Projects are listed in the fiscal year of their initiation.
In response to the COVID-19 pandemic, AEB has dedicated additional resources for advisory projects in 2020-21, in order to maintain agility and provide rapid response to the evolving situation.
2020-2021 | 2021-2022 | 2022-2023 | 2023-2024 | 2024-2025 |
---|---|---|---|---|
Audits | ||||
Management of Science (OCS, All science sectors) | Cloud Computing and Storage (CMSS, All sectors) | Implementation of NRCan’s IMT Strategy (CMSS, All sectors) | Use of Digital Platforms (CPS) | Management of Electronic Information (CMSS, All sectors) |
NRCan’s Security Function (CMSS) | NRCan Capital Asset Management (Real Property, Equipment) (CMSS, All sectors) | Domestic Engagement and Relations (SPI, All sectors) | Workplace Wellness (CMSS, All sectors) | Science and Technology Capacity (CMSS, OCS, All science sectors) |
Working Remotely (CMSS) | NRCan’s Data Management Strategy (SPI, CMSS, OCS) | Use of Artificial Intelligence in NRCan (OCS, CMSS, All Sectors) | Management of Travel (CCMSS) | Repayable Contributions (ETS, LCES, LMS, CFS) |
NRCan’s Business Continuity Planning Process (CMSS, All sectors) | Implementation of the Offshore Petroleum Accord Acts (CMSS, All sectors) | Disaster Preparedness (SPI, LMS, CFS) | Financial Planning, Forecasting, and Monitoring (CMSS, All sectors) | |
Information Management Security (SPI, CMSS, All sectors) | Management of NRCan’s Cost Recovery Projects (CMSS, All science sectors) | Cyber Security (CMSS, All sectors) | ||
TBD (OCG-led) | Horizontal AuditFootnote 2 – NRCan Performance Measurement (OCG-led) (SPI, All sectors) | TBD (OCG-led) | TBD (OCG-led) | TBD (OCG-led) |
Joint projects | ||||
Green Infrastructure (GI) - Electrical Vehicles & Alternative Fuels Infrastructure Demonstration Program & Smart Grids Program (ETS, LCES) | GI - Clean Energy for Rural and Remote Communities Program (LCES, ETS, CFS) | GI – Energy Efficient Buildings (LCES, ETS) | Targeted Geoscience (LMS) | Oil Spill Recovery Technology Program (ETS) |
GI –Emerging Renewables Program (LCES) | GC Wood - Green Construction via Wood (CFS) | NRCan’s Risk Management Practices (SPI, All sectors) | Geo-mapping for Energy and Minerals (LMS) | Arctic and Northern Policy Framework (LMS) |
Application of Gender-based Analysis Plus (GBA+) (SPI, All Sectors) | Spruce Budworm Early Intervention Strategy - Phase 2 (CFS) | Canadian Centre for Energy Information (LCES) | Management of Partnerships & Science Integration (OCS, All science sectors) | NRCan International Activities (SPI, All sectors) |
Management of Procurement Services (CMSS, All sectors) | Engagement with Indigenous Groups (IARS, MPMO, All Sectors) | NRCan’s Capacity to Support Mining (LMS) | NRCan’s Contribution to the Canadian Space Strategy (LMS, SPI, CFS) | |
NRCan’s Experimentation Strategy (SPI, All sectors) | ||||
Evaluations | ||||
Lower Carbon Transportation (LCES) | TMX Phase IV Partnership Office (NRCan-led, with DFO, ECCC, and TC) (MPMO) | Explosives Safety and Security (LMS) | Energy Efficiency for Climate Change Mitigation (LCES) | Wildfire Risk Management Program (CFS) |
HorizontalFootnote 2 – Indigenous Advisory and Monitoring Committees (NRCan-led) (MPMO, IARS) | Indigenous Forestry Initiative (CFS) | Fibre Solutions (CFS) | Canadian Geodetic Survey (LMS) | Sustainable Forest Management Program (CFS) |
Green Mining Innovation (LMS) | ||||
HorizontalFootnote 2 – Adapting to Impacts of Climate Change (Roll-up) (ECCC-led) (LMS, CFS) | Energy Safety and Security, and Petroleum Resources (SPPIO) | Zero Emissions Vehicle Infrastructure (LCES) | Green Infrastructure Synthesis (ETS, CFS, LCES) | Geoscience for Sustainable Development of Natural Resources (LMS) |
HorizontalFootnote 2 – World Class Tanker Safety System (TC-led) (ETS) | HorizontalFootnote 2 – Green Municipal Fund (ECCC-led) (LCES) | Tree planting (CFS) | Forest Sector Competitiveness (including Forest Sector Innovation & Expanding Market Opportunities) (CFS) | Canada-US International Boundary Treaty (LMS) |
HorizontalFootnote 2 – Oceans Protection Plan (TC-led) (ETS) | Energy Innovation Program and Program of Energy Research and Development (ETS) | HorizontalFootnote 2 – Federal Contaminated Sites Action Plan Phase IV (ECCC-led) (CMSS) | Geoscience to Keep Canada Safe (LMS) | |
HorizontalFootnote 2 – Species at Risk Caribou (ECCC-led) (CFS, MPMO) | HorizontalFootnote 2 – Terrestrial Cumulative Effects Initiative (ECCC-led) (MPMO) | |||
HorizontalFootnote 2 – Impact Assessment and Regulatory Processes (IAA-led) (CFS, SPPIO, LMS, SPI, MPMO, OCS) |
Planning Results: Continuous Auditing of Core Controls
The AEB will continue to undertake assurance-based continuous auditing to proactively identify potential systemic control issues and report annually on various processes. This work will be performed in accordance with the IIA Standards to provide reasonable assurance and will address key risks associated with significant departmental expenses. These have been identified, in part, based on the results of the Management Action Plans developed in response to the most recent Departmental Fraud Risk Assessment.
The three areas selected for continuous audit in 2020-21 are:
- Pay and Benefits;
- Offshore Revenues and Payments; and
- Procurement Processes and Professional Services.
NRCan’s annual report on continuous audit will be completed for the DAC’s fall 2020 meeting, covering continuous audit work conducted in 2019-20.
Follow-up on Audit and Evaluation Recommendations
AEB conducts follow-up on all audit and evaluation recommendations, from both internal and external providers. The follow-up process at NRCan consists of two main activities: self-assessment and validation.
First, management self-assesses the implementation progress for each recommendation and associated action plan. Second, when the self-assessment is that a recommendation and action plan have been fully implemented, AEB validates it by:
- conducting interviews;
- reviewing supporting documentation; and
- performing analysis and testing based on risk.
These two activities are undertaken on a semi-annual basis, in summer and winter. The annual reporting cycle concludes when the DM approves the annual Follow-Up Report. Once approved, the report is sent to the OCG.
In FY 2019-20, NRCan senior management implemented an additional quarterly monitoring process, supplementary to the established follow-up procedures, for selected audit and evaluations of significant interest. This process requires office of primary interest (OPI) to complete quarterly dashboards to track and report progress on implementing recommendations and action plans from the selected audit and evaluation reports.
Resources and Capacity
The AEB’s forecasted budget for FY 2020-21 is $5.1 million, of which $3.0 million is allocated to the audit function and the remaining $2.1 million to the evaluation function. An estimate of total resource capacity available was developed and allocated to AEB activities using metrics based on past experience. Approximately 7,350 person days of direct assurance engagements, evaluations, and advisory services, equating to 42 professional positions, are required for projects and activities in 2020-21. These resources provide AEB with the capacity to deliver the Plan to engage in other activities such as strategic and risk-based planning, follow-up on the implementation of recommendations, special studies, performance reporting, professional practices, and external audit liaison work. It should be noted that during the pandemic all AEB staff have been working remotely. As a result, AEB capacity to perform its work is being impacted by the pandemic and it will continue to assess the timelines for projects included in the IAEP.
Appendix 1: Five Year Evaluation Schedule (FYs 2020-25)
Departmental Results Framework (DRF) Program | Planned Evaluations – Including Joint Projects (next 5 years) | Planned Approval (FY) | FY 2020-21 Estimated Program Spending covered by Evaluation ($) | FY 2020-21 Total Planned DRF Program Spending ($) | Evaluation Driver/Rationale |
---|---|---|---|---|---|
1.01 Canadian Geodetic Survey: Spatially Enabling Canada | Evaluation of Canadian Geodetic Survey | 2024-25 | 5,745,765 | 5,745,765 | Program inventory coverage |
1.02 Geological Knowledge for Canada’s Onshore and Offshore Land | Joint audit and evaluation of Geo-mapping for Energy and Minerals | 2024-25 | 9,899,033 | 20,972,835 | TB commitment (anticipated) |
1.03 Core Geospatial Data | Horizontal Evaluation of Impact Assessment and Regulatory Processes (IAA-led) | 2022-23 | 5,233,042 | 20,341,252 | TB commitment |
1.04 Canada-US International Boundary Treaty | None | N/A | 0 | 1,942,507 | N/A |
1.05 Canada Lands Survey System | None | N/A | 0 | 13,705,397 | N/A |
1.06 Geoscience for Sustainable Development of Natural Resources | Evaluation of Targeted Geoscience Initiative Phase 5 | 2020-21 | 3,298,945 | 24,789,506 | TB commitment |
Joint audit and evaluation of Targeted Geoscience | 2024-25 | TB commitment (anticipated) | |||
Horizontal Evaluation of Impact Assessment and Regulatory Processes (IAA-led) | 2022-23 | 4,637,572 | TB commitment | ||
1.07 Pest Risk Management | Joint audit and evaluation of Spruce Budworm Early Intervention Strategy (Phase 2) | 2022-23 | 21,552,248 | 44,912,888 | FAA requirement |
Horizontal Evaluation of Genomics Research and Development Initiative (NRC led) | 2020-21 | 1,961,000 | Program inventory coverage | ||
1.08 Forest Climate Change | Horizontal Evaluation of Adapting to Impacts of Climate Change (Roll-up) (ECCC-led) | 2023-24 | 1,000,000 | 10,982,484 | TB commitment |
1.09 Climate Change Adaptation | Evaluation of Climate Change Adaptation | 2020-21 | 11,608,079 | 11,608,079 | TB commitment |
Horizontal Evaluation of Adapting to Impacts of Climate Change (Roll-up) (ECCC-led) | 2023-24 | TB commitment | |||
1.10 Explosives Safety and Security | Evaluation of Explosives Safety and Security | 2023-24 | 7,052,668 | 7,052,668 | Management request |
1.11 Geoscience to Keep Canada Safe | Evaluation of Geoscience to Keep Canada Safe | 2020-21 | 24,496,990 | 25,046,990 | TB commitment |
Evaluation of Climate Change Adaptation Program | 2020-21 | 550,000 | TB commitment | ||
Horizontal Evaluation of Adapting to Impacts of Climate Change (Roll-up) (ECCC-led) | 2023-24 | TB commitment | |||
1.12 Wildfire Risk Management | None | N/A | 0 | 13,472,2945 | N/A |
1.13 Polar Continental Shelf Program | Joint audit and evaluation of Polar Continental Shelf Program | 2020-21 | 13,442,583 | 13,442,583 | TB commitment |
2.01 Clean Energy Technology Policy, Research and Engagement | Evaluation of Clean Growth Hub | 2020-21 | 1,494,000 | 77,586,349 | TB commitment |
Horizontal Evaluation of World Class Tanker Safety System (TC-led) | 2021-22 | 503,000 | TB commitment | ||
Horizontal Evaluation of Oceans Protection Plan (TC-led) | 2022-23 | 1,195,800 | TB commitment | ||
Evaluation of Energy Innovation Program and Program of Energy Research and Development | 2023-24 | 36,997,177 | Program inventory coverage | ||
2.02 Clean Growth in Natural Resource Sectors | Joint audit and evaluation of Impact Canada Clean Technology Stream | 2020-21 | 48,500,859 | 98,614,386 | FAA requirement |
Evaluation of Clean Growth Funding Program | 2020-21 | 50,113,527 | FAA requirement | ||
2.03 Energy Innovation Program | Joint audit and evaluation of Green Infrastructure (GI) – Electric Vehicles and Alternative Fuels Infrastructure Demonstration & Smart Grids | 2021-22 | 29,601,175 | 96,172,997 | FAA requirement |
Joint audit and evaluation of GI - Clean Energy for Rural and Remote Communities | 2022-23 | 10,000,000 | FAA requirement | ||
Joint audit and evaluation of GI- Energy Efficient Buildings | 2022-23 | 4,571,822 | TB commitment | ||
Evaluation of Energy Innovation Program and Program of Energy Research and Development | 2023-24 | 52,000,000 | FAA requirement | ||
2.04 Green Mining Innovation | Evaluation of Green Mining Innovation Program | 2021-22 | 16,788,782 | 17,012,773 | Departmental priority |
Joint audit and evaluation of NRCan’s Capacity to Support Mining | 2024-25 | Departmental priority | |||
Horizontal Evaluation of Impact Assessment and Regulatory Processes (IAA-led) | 2022-23 | 223,991 | TB commitment | ||
2.05 Fibre Solutions | Evaluation of Fibre Solutions | 2023-24 | 7,391,623 | 7,391,623 | Program inventory coverage |
2.06 Sustainable Forest Management | Horizontal Evaluation of Species at Risk - Caribou (ECCC-led) | 2021-22 | 518,950 | 16,216,095 | TB commitment |
Horizontal Evaluation of Impact Assessment and Regulatory Processes (IAA-led) | 2022-23 | 1,838,582 | TB commitment | ||
Evaluation of Tree Planting | 2023-24 | 0 | TB commitment (anticipated) | ||
2.07 Cumulative Effects | Horizontal Evaluation of Species at Risk - Caribou (ECCC-led) | 2021-22 | 518,950 | 8,510,114 | TB commitment |
Horizontal Evaluation of Impact Assessment and Regulatory Processes (IAA-led) | 2022-23 | 797,680 | TB commitment | ||
Horizontal Evaluation of Terrestrial Cumulative Effects Initiative (ECCC-led) | 2023-24 | 5,083,655 | TB commitment | ||
2.08 Lower Carbon Transportation | Evaluation of Lower Carbon Transportation | 2021-22 | 30,875,544 | 42,687,502 | Program inventory coverage |
Evaluation of Zero Emissions Vehicle Infrastructure | 2023-24 | 11,811,958 | FAA requirement | ||
2.09 Electricity Resources | Evaluation of Renewable Energy Deployment | 2020-21 | 42,041,838 | 154,129,783 | FAA requirement |
Joint audit and evaluation of GI- Electric Vehicles Infrastructure Demonstration & Smart Grids | 2021-22 | 16,015,321 | FAA requirement | ||
Joint audit and evaluation of GI – Emerging Renewables Program | 2021-22 | 49,935,879 | FAA requirement | ||
Horizontal Evaluation of Impact Assessment and Regulatory Processes (IAA-led) | 2022-23 | 1,043,865 | TB commitment | ||
Joint audit and evaluation of GI – Clean Energy for Rural and Remote Communities Program | 2022-23 | 27,989,814 | FAA requirement | ||
2.10 Energy Efficiency | Horizontal Evaluation of Green Municipal Fund (ECCC-led) | 2021-22 | TBC | 64,603,577 | FAA requirement |
Evaluation of Energy Efficiency | 2020-21 | 25,825,892 | FAA requirement | ||
Evaluation of Energy Efficiency for Climate Change Mitigation | 2024-25 | TB commitment | |||
Joint audit and evaluation of GI – Clean Energy for Rural and Remote Communities Program | 2022-23 | 20,000,000 | FAA requirement | ||
Joint audit and evaluation of Energy Efficient Buildings | 2022-23 | 18,777,685 | TB commitment | ||
2.11 Energy and Climate Change Policy | Horizontal Evaluation of Clean Growth and Climate Change – International Cooperation (ECCC-led) | 2020-21 | TBC | 8,762,794 | TB commitment |
Evaluation of Energy and Climate Change Policy | 2020-21 | 5,391,917 | Departmental priority | ||
Joint audit and evaluation of Canadian Centre for Energy Information | 2023-24 | 3,370,877 | TB commitment | ||
2.12 Innovative Geospatial Solutions | Horizontal Evaluation of Impact Assessment and Regulatory Processes (IAA-led) | 2022-23 | 1,458,534 | 18,530,401 | TB commitment |
3.01 Forest Sector Competitiveness | Horizontal Clean Growth and Climate Change – International Cooperation (ECCC-led) | 2020-21 | 600,000 | 52,894,773 | TB commitment |
Joint audit and evaluation of Green Construction via Wood | 2021-22 | 10,229,474 | FAA requirement | ||
Evaluation of Indigenous Forestry Initiative | 2021-22 | 4,178,881 | Management request | ||
Horizontal Evaluation of Impact Assessment and Regulatory Processes (IAA-led) | 2022-23 | 150,000 | TB commitment | ||
Joint audit and evaluation of GI – Clean Energy for Rural and Remote Communities program | 2022-23 | 15,000,000 | FAA requirement | ||
Evaluation of Forest Sector Competitiveness (including Forest Sector Innovation & Expanding Market Opportunities) | 2024-25 | 23,336,418 | FAA requirement | ||
3.02 Provision of Federal Leadership in the Minerals and Metals Sector | Joint audit and evaluation of the Extractive Sector Transparency Measures Act | 2020-21 | 1,014,500 | 17,414,961 | Departmental priority |
Horizontal Evaluation of Impact Assessment and Regulatory Processes (IAA-led) | 2022-23 | 430,693 | TB commitment | ||
Joint audit and evaluation of NRCan’s Capacity to Support Mining | 2024-25 | 15,969,768 | Departmental priority | ||
3.03 Energy Safety and Security, and Petroleum Resources | Evaluation of Energy Safety and Security, and Petroleum Resources | 2022-23 | 9,413,217 | 10,561,141 | Departmental priority |
Horizontal Evaluation of Impact Assessment and Regulatory Processes (IAA-led) | 2022-23 | 1,147,924 | TB commitment | ||
3.04 International Energy Engagement | Horizontal Evaluation of Clean Growth and Climate Change – International Cooperation (ECCC led) | 2023-24 | 3,218,848 | 5,214,158 | TB commitment |
3.05 Statutory Offshore Payments | N/A | N/A | N/A | 305,247,606 | Exempt from evaluation - statutory payment |
3.06 Natural Resources Canada's Indigenous Partnerships Office - West | Horizontal Evaluation of Indigenous Advisory and Monitoring Committees (NRCan-led) | 2021-22 | 18,813,106 | 18,813,106 | FAA requirement |
Joint audit and evaluation of NRCan’s Engagement with Indigenous Groups | 2023-24 | Departmental priority | |||
3.07 Major Projects Management Office Initiative | Horizontal Evaluation of the Major Projects Management Office Initiative | 2020-21 | 7,394,519 | 13,694,519 | TB commitment |
Evaluation of TMX Phase IV Partnership Office | 2021-22 | 6,300,000 | TB commitment | ||
3.08 Science & Technology Internship Program | None | N/A | 0 | 2,051,783 | N/A |
Internal Services | |||||
Communication Services | None | N/A | 0 | 12,183,318 | N/A |
Management and Oversight | Joint audit and evaluation of NRCan's Departmental Governance | 2020-21 | 40,501,951 | 40,501,951 | Departmental Priority |
Joint audit and evaluation of Transition to the Departmental Results Framework | 2020-21 | Departmental Priority | |||
Joint audit and evaluation of Application of Gender-based Analysis Plus (GBA+) | 2021-22 | Departmental Priority | |||
Joint audit and evaluation of NRCan's risk management practices | 2023-24 | Departmental Priority | |||
Joint audit and evaluation of NRCan's Experimentation Strategy | 2023-24 | Departmental Priority | |||
Joint audit and evaluation of Management of Partnerships and Science Integration | 2024-25 | Departmental Priority | |||
Acquisition Management | Joint audit and evaluation of Management of Procurement Services | 2022-23 | 4,068,632 | 4,068,632 | Departmental Priority |
Financial Management | None | N/A | 0 | 15,663,545 | N/A |
Human Resources Management | None | N/A | 0 | 16,362,393 | N/A |
Information Management | None | N/A | 0 | 7,737,292 | N/A |
Information Technology | None | N/A | 0 | 16,020,324 | N/A |
Legal Services | None | N/A | 0 | 1,194,446 | N/A |
Real Property Services | Horizontal Federal Contaminated Sites Action Plan Phase IV (ECCC-led) | 2024-25 | 0 | 14,184,859 | TB commitment |
Materiel Management | None | N/A | 0 | 972,144 | N/A |
Total: | $803,430,403Table 6 Footnote 3 | $1,073,766,987Table 6 Footnote 3 | |||
Percentage of FY 2020-21 planned spending covered by five-year IAEP: | 75%Table 6 Footnote 3 | ||||
Table Notes:
|
Page details
- Date modified: