Language selection

Search


British Columbia (B.C.)

The B.C. case studies listed here were created or supported by CCIAD.

Each case study listing provides icons for quick topic reference, location, title, link and summary. A legend is also provided on the right.


District of Saanich - Community Adaptation Plan Case Study

Cover page of case study, titled,  District of Saanich- Community Adaptation Plan Case Study

(2010) (PDF, 744KB, 1 page).

The municipality of Saanich’s Climate Change Adaptation Plan reviewed ten vulnerable sectors in the community, including infrastructure, transportation, agriculture, ecosystems and health, and identifying potential actions to address vulnerabilities.

agriculture coastal management communities Forestry Intrastructure

Saanich, Vancouver Island


Vulnerability of Vancouver Sewerage Area Infrastructure to Climate Change

Cover page of csase study, titled, Vulnerability of Vancouver Sewerage Area Infrastructure to Climate Change

(2008) (PDFs, 293KB, 10 pages).

Using the Public Infrastructure Engineering Vulnerability Committee’s assessment protocol, this project examines climate change impacts on a subsection of Metro Vancouver’s sewerage infrastructure, with a focus on increased rainfall in an area predominantly serviced by combined sewers.

Urban Communities Intrastructure Water resources

Vancouver


Communities Adapting to Climate Change Initiative - City of Rossland - Case Study

Cover page of case study, titled, Communities Adapting to Climate Change Initiative - City of Rossland - Case Study

(2009) (PDF, 315KB, 8 pages).

As part of Columbia Basin Trust’s Communities Adapting to Climate Change Initiative, the City of Rossland undertook a one-year climate change adaptation planning process focused upon the vulnerability of infrastructure, water, energy and food.

AgricultureUrban Communities EnergyIntrastructure TransportationWater resources

Rossland


Communities Adapting to Climate Change Initiative - City of Castlegar - Case Study

Cover page of case study, titled, Communities Adapting to Climate Change Initiative - City of Castlegar - Case Study

(2009) (PDF, 288KB, 9 pages).

As part of Columbia Basin Trust’s Communities Adapting to Climate Change Initiative, the City of Castlegar embarked on a one-year climate change adaptation planning process focused upon water resources, local food and agriculture, along with the municipal stormwater system.

AgricultureUrban Communities Transportation Water resources

Castlegar


Communities Adapting to Climate Change Initiative - Regional District of Central Kootenay Area D in partnership with Village of Kaslo - Case Study

Cover page of case study, titled, Communities Adapting to Climate Change Initiative - Regional District of Central Kootenay Area D in partnership with Village of Kaslo -  Case Study

(2009) (PDF, 390KB, 8 pages).

As part of Columbia Basin Trust’s Communities Adapting to Climate Change Initiative, the Regional District of Central Kootenay Area D in partnership with the Village of Kaslo embarked on a one-year climate change adaptation planning process whose priority impact areas were water provision and quality as well as local food production.

Agriculture Urban Communities Transportation Water resources

Kaslo & Regional District of Central Kootenay-Area D


Columbia Basin: Final Report - Communities Adapting to Climate Change

cover page of case study, titled, Columbia Basin: Final Report – Communities Adapting to Climate Change

(2010-2011) (PDF, 234 KB, 12 pages).

Columbia Basin Trust provides a comprehensive account of lessons learned throughout the adaptation planning process for three communities within the Basin.

Communities Water resources

Columbia Basin


City of Prince George

Cover page of case study, titled, City of Prince George

(2009) (PDF, 1.52 MB, 3 pages).

Adaptation priorities for the city of Prince George to address the impacts of the mountain pine beetle, flooding and the effects of climate change upon transportation infrastructure.

Communities Infrastructure Forestry Transportation Water resources

Prince George


Cariboo Regional District

Cover page of case study, titled, Cariboo Regional District

(2011) (PDF, 2.74 MB, 4 pages).

A climate change lens was applied to the analysis of current local government services, regional growth and development issues to produce the Cariboo-Chilcotin Climate Change Adaptation Strategy.

Agriculture Energy Forestry Intrastructure Transportation Water resources

Cariboo


Vulnerability of Fraser Sewerage Area Infrastructure to Climate Change

Cover page of case study, titled, Vulnerability of Fraser Sewerage Area Infrastructure to Climate Change

(2009) (PDF).

The PIEVC infrastructure risk protocol was used to analyse climate change risks to the Fraser Sewerage Area, with a focus on separated sanitary sewer systems.

Coastal management Intrastructure Water resources

Metro Vancouver


Vulnerability of Coquihalla Highway – Hope to Merritt Section

Cover page of case study, titled, Vulnerability of Coquihalla Highway – Hope to Merritt Section

(2010) (PDF).

The PIEVC infrastructure risk assessment protocol was used to identify highway components that may be at risk of failure, damage and/or deterioration from extreme climatic events, or of significant changes to baseline climate design values.

Transportation Intrastructure

Coquihalla Highway (Hope – Merritt)


Vulnerability of Stormwater Treatment System – City of Castlegar

Cover page of case study, titled, Vulnerability of Stormwater Treatment System

(2010) (PDF).

The PIEVCs infrastructure risk assessment protocol was used to analyze climate related risks to Castlegar’s Stormwater Collection System.

Communities Intrastructure Water resources

Castlegar


Assessment of Yellowhead Hwy 16

Cover page of case study, titled, Assessment of Yellowhead Hwy 16

(2011) (PDF).

The PIEVC infrastructure risk assessment protocol was used to identify components of a section of the Yellowhead Highway in BC that may be at risk of failure, damage and/or deterioration from extreme climatic events, or of significant changes to baseline climate design values.

Intrastructure Transportation

Yellowhead Highway (Vanderhoof – Priestly Hill)


Xat’sūll First Nation (Soda Creek) Climate Change Adaptation Case Study

Cover page of case study, titled, Xat’sūll First Nation (Soda Creek) Climate Change Adaptation Case Study

(2009) (PDF, 390KB, 8 pages).

Results of two adaptation workshops conducted by the Soda Creek Band as part of the Comprehensive Community Planning Process.

Communities Energy Fisheries Forestry Intrastructure Mining Transportation Water resources

Soda Creek


Prince George Climate Change Adaptation Strategy

Cover page of case study, titled, Prince George Climate Change Adaptation Strategy

(2012) (PDF, 17 MB, 8 pages).

A step-by-step account of how the resource-based community of Prince George mainstreamed adaptation through the execution of a City Adaptation Workshop and risk matrices.

Communities Forestry Intrastructure Transportation Water resources

Prince George


Gibsons Harbour Area Plan

Cover page of case study, titled, Gibsons Harbour Area Plan

(2012) (PDF, 17 MB, 6 pages).

Highlights the importance of public awareness in establishing adaptation measures for the town’s harbour area.

Coastal management Communities Intrastructure

Gibsons


Interim Flood Construction Levels

Cover page of case study, titled, Interim Flood Construction Levels

(2009) (PDF, 17 MB, 5 pages).

Addresses sea-level rise and flooding through the development of interim flood construction levels.

Coastal management Intrastructure Water resources

Vancouver


Flood Management Planning in Delta

Cover page of case study, titled, Flood Management Planning in Delta

(2009) (PDF, 17 MB, 4 pages).

Details the role of municipal planning in devising an adaptation strategy to address sea-level rise.

Coastal management Intrastructure Water resources

Delta


Implementing Climate Change Adaptation in Prince George: my PG…in action

Cover page of case study, titled, Implementing Climate Change Adaptation in Prince George: my PG…in action

(2012) (PDFs)

Prince George's Integrated Community Sustainability Plan (myPG) is the product of over a year of community engagement and consultation; eight volumes detail specific areas for adaptation in a variety of sectors.

Volume 1 – The myPG Integrated Community Sustainability Plan.
(PDF, 1,319 KB, 35 pages).

Volume 2 – The Official Community Plan
(PDF, 1,247 KB, 27 pages).

Volume 3 – Forests
(PDF, 1,524 KB, 46 pages).

Volume 4 – Flooding
(PDF, 525 KB, 19 pages).

Volume 5 – Transportation Infrastructure
(PDF, 1,565 KB, 41 pages).

Volume 6 – Natural Areas and Ecosystems
(PDF, 958 KB, 24 pages).

Volume 7 – Precipitation and Freeze-Thaw
(PDF, 594 KB, 13 pages).

Volume 8 – Ongoing and Future Initiatives
(PDF, 579 KB, 19 pages).

Five videos accompany these case studies:

cover page of case study, titled, Implementing Climate Change Adaptation in Prince George: my PG…in action

Video 1 – Adaptation Process Summary (Flash video, 5:47)

Video 2 – Adaptation and Sensitive Ecosystems (Flash video, 3:12 sec.)

Video 3 – Adaptation and Flooding (Flash video, 4:09)

Video 4 – Adaptation and Forests (Flash video, 3:12)

Video 5 – Adaptation and Transportation (Flash video, 4:42)

Agriculture Communities Forestry Health Intrastructure Transportation Water resources

Prince George


Okanagan Water Supply and Demand Project - Water Science for the Long-term

Cover page of case study, titled, Okanagan Water Supply and Demand Project - Water Science for the Long-term

(2012) (PDF, 625 KB, 14 pages).

An account of measures taken to improve water conservation and management across the Basin by enhancing water supply and demand information, and providing it to relevant actors.

Agriculture Communities Water resources

The Okanagan Valley


Adaptation to Safeguard Somass Basin Salmon Populations

Cover page of case study, titled, Adaptation to Safeguard Somass Basin Salmon Populations

(2012) (PDF, 487 MB, 12 pages).

The latest update of a four-phased action plan, including investments to date, designed to address climate change and variation impacts on Alberni salmon futures.

Coastal management Communities Energy Fisheries Intrastructure Water resources

Somass Basin, Vancouver Island


Theodosia

Cover page of case study, titled, Theodosia

(2012) (Flash video, 21:03).

Video of the community’s experiences with climate change, divided into three parts:

  • Historical accounts of the Theodosia watershed from Sliammon elders;
  • Land and water use in the Theodosia watershed; and,
  • Climate change impacts and adaptation study.
Communities Fisheries Intrastructure Water resources

Theodosia Watershed


 

Page details

Date modified: