Commissioning (Cx) is an intensive quality assurance process that begins at the design phase of a new building and continues throughout its construction, occupation and operation (usually during the first 12 months). Cx is a process that ensures that the new building functions as the owner initially intended and that the building staff can operate the building and ensure its maintenance.

For Successful Commissioning

For a successful Cx project, CanmetENERGY offers engineers, technicians, managers, owners and stakeholders tools for the various stages of building construction – from design to post-construction.

Significant Advantages

  • harmonize the work and coordination between the different trades at the building design phase
  • better planning of work and, therefore, compliance with deadlines
  • ensure the optimization of installations
  • reduce building operation and maintenance costs
  • prolong the life of installations

To Ensure the Persistence of Commissioning Benefits

CanmetENERGY developed the DABOTMapplication software tool, which continuously monitors a building’s electromechanical components. To date, use of the software has yielded energy savings of 10 to 25% in the buildings in which it has been installed.