Filter your results
Collection
Agreement value
Showing 401 to 410 of 645 results.
Integrated Approach to Development of a High Efficiency Energy Recovery and Intelligent Ventilation System
Lead Proponent: dPoint Technologies Location: Vancouver, BC
Integrating Renewables and Conservation Measures in a Net-Zero Energy Low-Rise Residential Subdivision
Lead Proponent: Owens Corning Canada LP
Intelligent Net-zero Energy Buildings
Lead Proponent: Concordia University Location: Montreal, QC
Plug & Play Building-Integrated Photovoltaic and Thermal (BIPV-T) Technologies
Lead Proponent: Montréal ZERO Inc. Location: Montreal, Quebec
Thermoacoustic Cogeneration Engine Development
Lead Proponent: Etalim Inc. Location: Vancouver, BC
BC Remote Community Integrated Energy (BCRCIE) Project
Lead proponent: Province of BC Location: Lasqueti Island, BC
Canadian Hydrokinetic Turbine Test Centre (CHTTC)
Lead Proponent: University of Manitoba Location: Winnipeg, MN
Development of Codes and Standards for Marine Energy Converters
Lead Proponent: Marine Renewables Canada Society Location: Nanaimo, BC
Front End Engineering and Design (FEED) Study Whapmagoostui - Wind Hybrid Power Plant
Lead proponent: Nimschu Iskudow (NI) Inc.
Front End Engineering and Design Study (FEED) for the Dent Island Tidal Power Generation Project
Lead Proponent: Water Wall Turbine Inc.